Laserfiche WebLink
<br />RECLAMAT IOG COST SUMMARY cb n['d sheet J of 4 <br />H. EAATHWOP.K - STREAM CHA.WEL RECONSTRUCTION <br />Task <br />_____ No.~ <br />___I ________ Task Description <br />, ~ Cost <br />_______ 151 <br />___ <br />Subtotal IH1: <br />I. EARTHWORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No. Task Description ~ Cos[ (51 <br />________________________________________________________________________ <br />Subtotal II): <br />J. EARTHWORK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.~ Task Descriptron <br />________I____________________________________ <br />6 ~ Replace Tops orl on 2h aw slopes <br />'1 ~ Replace Topsoil around Facility Area <br />~ Cost (51 <br />$14,198 <br />528,483 <br />____________________ <br />Su bcocal (J): 542,681 <br />