Laserfiche WebLink
Coloradd Division of Minerals and Ge~y <br />ESTIMATING FORM - SCRAPER W RK <br />TASK IDENTIFICATION: <br />task no.: 6 prep. by: ESC permit no.: M-/i-N7 <br />Gate: 09/01/98 Ne name: M141-6 mme name' L'/tA15 Gl:0i^/ <br />permit action: RQQ'lalnata alnOL'n! 01 reCUlled 60nC1 <br />task description: P,0 IaCe 1005611 On 2h'7v 510 'P.S IabOVr.' iLChvV;llh <br />HOURLY EQUIPMENT COST: <br />caunry: dOIrLDER labor zone: 1 shMS/day: S <br />EQUIPMENT DESCRIPTIONS: <br />scraper team: <br />CAT 637E twih 1-G9N Dash los<:Inr dozer d ROPS C3h <br />road maintenance: motor grades NA <br />water trvcM: NA <br /> <br />COST DATA: SCRAPER TEAM <br />scraper dozens) ROAD MAINTENANCE <br />grader water truck <br />rate name: 631ED9N1 0 NA NA <br />utllizatlon: 100°, 33°~ A'A N.4 <br />cost/hour: ownership: 5.15.78 53862 NA NA <br />overating: S 102 57 525 68 NA NA <br />operator. 523.73 522.95 I\W PIA <br />unit subtotals: / I <br />team subtotals: <br /> TOTAL WORK TEAM COS <br />MATERIAL QUANTITIES:. " <br />S ~ <br />beginning volume: 11000 GCY matedal swell lector 1.115 <br />cubic yartl volume: 11.000 CCY final volume: 12.265 LCY <br />source or volume /lgure: Reclamation Plan <br />source or swell [actor CAT Handbook- earth IDanl <br />j <br />.y~-x - - <br />HOURLY PRODUCTION: " -` <br />SCRAPER CYCLE TIME: <br />scraper loatling time (min.j: 0 6 JOB CONDITION CORRECTION FACTORS: <br />site altitude (11. J: 5700 <br />maneuver8 spreading time (min.): 0.7 auitutle adJustment: 0.96 <br />travel lime • (haul 8 return): fob efgtienty factor 0 83 <br />haul route: net job cortectlon factor 0.7968 <br />road <br />seg. no. length <br />(tt.) grade <br />res. (Y.) rolling <br />res. (:) total <br />res. (%) velocity <br />(fpm) Vavel time <br />(minutes) <br />1 400 25.00 5 00 30.00 196 2.08 <br />2 1500 5.00 5.00 10.00 651 2.29 <br /> <br /> <br /> <br /> <br /> <br /> <br />return route: haul time: _ <br />1 7500 -5.00 5.00 0.00 2956 0.61 <br />2 400 -25.00 5.00 -20.00 1118 0.47 <br /> <br /> <br /> <br /> <br /> <br /> <br />' 1 sl 8 last seg. atll for accelenllon/deceleration return time: <br />total cycle time: 6.69 <br />MACHINE PAYLOAD: <br />mat. weight (lbsllty): 2100 00 MACHINE VOLUME: <br />struck capacity (Icy): 27 00 <br />mat tlesc.: Earth-Loam heaped capacity (ICy): 31.00 <br />rated payload (Ibs): 75.000 average capacity (Icyl: 26.00 <br />payload volume (Icy): 35.71 atljusted volume Ilcyl: 26.00 <br />UNADJUSTED HOURLY PRODUCTION PER SCRAPER OR PUSH-PULL PAIR ILCYIHRi: <br />ADJUSTED Uob candltlon corrections) HOURLY UNIT PRODUCTION (LCYIHR): 16$ 62 <br />ADJUSTED HOURLY FLEET PRODUCTION (LCYIhr): <br />JOB COST: <br />FLEET IZE: 2 scraper(s) TO AL JOB TIME (hours) <br />UNIT COST 1 LCY: 51.158 TOTAL JOB COST. S <br />9 <br />1 <br />I <br />37L63 I <br />y ..~ <br />33.00 <br />14 798 -' `~ <br />