Laserfiche WebLink
April 2, 1992 <br />The CONTRACTOR shall obtain all permits and/or permission <br />required to use public and private roads. The CONTRACTOR shall <br />obey all laws and regulations affecting the use of public <br />thoroughfares. <br />The CONTRACTOR shall provide such temporary barricades, fences, <br />or warning signs as may be necessary to make temporary or <br />permanent roads safe by night as well as by day. He shall at all <br />times have a sufficient number of watchmen, flagmen, and warning <br />lights to protect traffic where it is interfered with by his <br />operations, where his trucks enter or leave public roads, or <br />where work is being done adjacent to such roads. <br />19. PERMITS. LICENSES AND REGULATIONS <br />Permits and licenses required for prosecution of the work shall <br />be procured and paid for by the CONTRACTOR. <br />20. ESTIMATED QUANTITIES <br />The CONTRACTOR shall understand that the quantities and <br />measurements set forth in the Special Conditions are in no case <br />exact and in some instances the exact quantities and measurements <br />are impossible to determine until after conditions have become <br />known during construction; that the quantities shown in the <br />Special Conditions are for use as a basis for comparing bids <br />only. The OWNER does not expressly, or by implication, agree <br />that the actual amount of work performed or material furnished or <br />installed will correspond therewith and further, that during the <br />progress of the work the OWNER may find it advisable and shall <br />have the right to make changes in locations of portions of the <br />work, to omit portions of the work and to increase or decrease <br />the quantities, as may be deemed necessary or desirable. Under <br />no circumstances or conditions will the CONTRACTOR be paid <br />anything on account of anticipated profits upon the work or any <br />portion thereof covered by the Contract which is not actually <br />performed; nor will the CONTRACTOR be paid more than the unit <br />price bid for any item of the Bid because the actual quantity is <br />greater or less than the quantity shown in the Invitation and Bid <br />Sheet. <br />Measurements of any openings have been made in sufficient detail <br />to establish general shapes and dimensions. The locations and <br />dimensions of vertical and horizontal openings and depths of <br />materials shown on the documents as waste material, soil and <br />unconsolidated material and rock material are approximate <br />measurements only and shall be verified by excavation. <br />MLRD-11 <br />