My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL34916
DRMS
>
Back File Migration
>
General Documents
>
GENERAL34916
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:56:09 PM
Creation date
11/23/2007 8:06:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981037
IBM Index Class Name
General Documents
Doc Date
7/10/1992
Doc Name
INVITATION AND BID
Permit Index Doc Type
RECLAMATION PROJECTS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 2, 1992 <br />when the insurance certificates and bonds are submitted to the <br />Mined Land Reclamation Division and found to be in order, the <br />CONTRACTOR shall enter into a written Purchase Order contract <br />with the OWNER. <br />7. PROJECT SCHEDULE <br />The successful bidder shall, within ten (10) days after receipt <br />of the Notice of Award, and prior to issuance of a Purchase <br />order, furnish a plan for construction of the work showing (1) <br />the date(s) he expects to move various pieces of equipment onto <br />the work site, and (2) the dates and period(s) he proposes to <br />perform each phase of the project work. <br />8. NOTICE TO PROCEED <br />After a Purchase Order has been issued, the OWNER will issue <br />Notice to Proceed. Under no circumstances shall the CONTRACTOR <br />begin work before a Notice to Proceed is issued. <br />9. WORK PROGRESS <br />The CONTRACTOR agrees that work will be performed with due <br />diligence in accordance with good engineering and construction <br />practices to the end that the entire contract work shall be <br />completed within the time specified in the Special Conditions <br />after receipt of the Notice to Proceed. It is expressly <br />understood and agreed, by and between the parties hereto, that <br />the stipulated performance time for completion of the work <br />described is a reasonable time for completion of the work, taking <br />into consideration all factors, including average climatic <br />conditions prevailing in the area. <br />For good and sufficient cause, such as (a) unsuitable weather, <br />(b) faulty workmanship, (c) improper superintendence, (d) the <br />CONTRACTOR'S failure to carry out any reasonable order or to <br />perform any provision of the purchase order and collateral <br />documents, or (e) any other circumstance unfavorable for <br />prosecution of the work, the OWNER shall have the right to <br />suspend the CONTRACTOR'S performance of the work. Notice of such <br />suspension shall be in writing. The CONTRACTOR shall resume <br />performance of the work promptly when so notified in writing. <br />The CONTRACTOR shall not be entitled to any cost or damages <br />resulting from such suspension. There will be added to the time <br />estimated for the project work noted in the Special Conditions <br />the number of days, if any, that the CONTRACTOR is allowed for <br />reasons of unusual, unsuitable weather as stipulated above. No <br />extension of time shall be allowed for reasons as stipulated in <br />(b), (c), and (d) above. <br />MLRD-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.