Laserfiche WebLink
Block 2 contains live-handled roto-cleared topsoil that was seeded in the spring of 1993. <br />• 1995 -Gully shaped and matted, Downdrain 3. <br />Block 3 contains live-handled roto-cleared topsoil (1993) that was seeded in the spring of 1994. <br />• 1996 -Lower slope area redisturbed to blend into Lower Moffat Road; gullies in redisturbed <br />azea repaired and reseeded during the reshaping activity. <br />Block 4 contains live-handled roto-cleared topsoil (1993) and was not seeded to further the trial <br />area started with Block 1. <br />• 1995 - At midpoint of Block, a portion was interseeded and livestock imprinted. <br />• 1996 -Gully repair and reseeding on lower slopes at midpoint of block where previous <br />livestock imprinting efforts where considered insufficient. <br />Block 5 contains live-handled roto-cleazed topsoil (1993) that was seeded in the spring of 1994. <br />• 1995 -Gullies repaired in conjunction with construction of Downdrain 1. <br />Block 6 contains live-handled roto-cleazed topsoil (1993) that was seeded in the spring of 1994. <br />• 1996 -Gully repaired and reseeded on lower slope. <br />• 1997 -Gullies caused by runoff from Lower Moffat Road narrowing activities repaired and <br />reseeded on upper slope. <br />• Block 7 contains live-handled roto-cleared topsoil (1994) that was not seeded as part of the [es[ <br />practice employed in Blocks l and 4. <br />• 1995 -Gully repaired and reseeded on lower slope. <br />Block 8 contains live-handled roto-cleared topsoil (1994) and was seeded in (1995). <br />• 1997 -Gully repaired and reseeded on lower slope south of downdrain 4. <br />Block 9 contains live-handled roto-cleared topsoil (1994) and was seeded in 1995. <br />• 1996 -Gullies along the lower slope repaired and reseeded. <br />• ~ 1997 -Gullies caused by runoff from Lower Moffat Road narrowing activities repaired and <br />reseeded on upper slope. <br />Block 10 contains stockpiled topsoil (1996) and was seeded in 1996. This block was also <br />contour furrowed. <br />•• 1997 -Several gullies were repaired and reseeded at various locations in this block. Areas <br />included: the northwestern most edge; the central upper and lower portion of the block where <br />gully drainage entered into the Moffat final pit drainage channel; along Downdrain 4 where a <br />system of gullies occurred; along the western edge of the reclaimed Middle Moffat Haul road <br />in the vicinity of Downdrain 2 and; along the western edge of the reclaimed shoulder of the <br />narrowed Lower Moffat Road. <br />•• 1998 -Gullies along hillslope which drain into the final pit drainage repaired and reseeded. <br />4 <br />