My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL34851
DRMS
>
Back File Migration
>
General Documents
>
GENERAL34851
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:56:07 PM
Creation date
11/23/2007 8:04:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978271
IBM Index Class Name
General Documents
Doc Date
2/5/1999
Doc Name
GARRETT PIT M-78-271 RECALCULATION RECLAMATION COSTS INCREASED BOND NEEDED
From
DMG
To
ASPHALT GRAVEL PRODUCTS INC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~~ • • <br />According to the State statutes and the Rules and Regulations, the operator must maintain the bond at a <br />level sufficient to filly reclaim the site, and the operator has a period of sixty (60) days from date of <br />notification to provide such bond increase to the Division. This is being sent via certified mail to ensure <br />that the 60-day period is known. Failure to comply with either item may become a possible violation. <br />If you have questions or comments about this estimate, or wish to request new bond forms, you may reach <br />me at the Division's Durango field office: 484 Turner Dr., Bldg. F-101, Durango CO 81301; tel <br />970/247-5193 or fax 970/247-5104. <br />Sincerely, <br />ba~ l~~ <br />Bob Oswald <br />Environmental Protection Specialist <br />Enclosure: reclamation cost estimate <br />Cc: Suzi Ericksen, DMG <br />A:\garrett. i ncrfw/rco/d 12/msw <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.