Laserfiche WebLink
II I I I I I II I I I I III III RECEI vED <br />aPk - ~ 195 <br />EASTSIDE COAL COMPANY, INC. <br />P. o. eox tbt idINED LAND RECLAMATION DIVISI61 <br />Silt, Colondo 81652 Colo. Dept. of Natural ReSOiur.~: <br />(303)876-2944 <br />April 2, 1985 <br />Joe Oliver, Reclamation Specialist <br />Colorado Mined Land Reclamation Division <br />423 Centennial Building <br />1313 Sherman St. <br />Denver, CO 80203 <br />Re: Eastside Coal Company, Inc. Permit No. C-84-063 <br />Stipulation No. 8 and Stipulation No. 9 <br />Dear Mr. Oliver: <br />Stipulation No. 8 requires a stability analysis of the steep- <br />est slopes constructed during the reclamation phase of the <br />permit. Revised page 101 lists the minimum safety factor of <br />2.8 for the reclaimed areas. <br />Stipulation No. 9 requires the elimination of the discharge <br />pipes in the subdrain system of the waste pile. Revi:;ed <br />pages 97C, 97D, & 97-D1 removes the discharge pipe and re- <br />places the pipe with a gravel drain. <br />The revised study prepared by Lambert and Associates elated <br />March 14, 1985. needs to be inserted in Appendix K. <br />Sincerely, <br />.~Zj~D.C.~,2 <br />Stephen Se <br />General Manager <br />Enclosures <br />SS/mr <br />