My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL34826
DRMS
>
Back File Migration
>
General Documents
>
GENERAL34826
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:56:06 PM
Creation date
11/23/2007 8:04:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981039
IBM Index Class Name
General Documents
Doc Date
9/22/1997
Doc Name
GRASSY GAP MINE C-81-039 MAINTENANCE WORK & DEVIS REMOVAL
From
DMG
To
CROSS MOUNTAIN RANCH
Permit Index Doc Type
RECLAMATION PROJECTS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
will not exceed a depth of 6" . The width of the base application will not exceed 12'. <br />Measurement and Payment <br />Payment for this task will be reflected under Item 5 of the Bid Schedule as a 10 yds' load <br />price. The 10 yds' load price shall reflect the CONTRACTORS estimate for procuring, <br />delivery and the spreading out of the specified roadbase to complete the task. Measurement <br />will be actual 10 yds' loads required to complete work as directed and approved by the <br />PROJECT MANAGER. All of the loads outlined under [tem 5 aze NOT guaranteed. <br />PROJECT OBSERVATION <br />The PROJECT MANAGER will be at the project site periodically to monitor construction <br />activities and ensure that each work item is completed and constructed to design <br />specifications. The PROJECT MANAGER will be available during regular business hours <br />(8:00 A.M. to 5:00 P.M.) on weekdays. Inspections will not be scheduled on weekend days <br />or holidays without prior approval of the PROJECT MANAGER. It is the Contractor's <br />responsibility to schedule inspections with the Project Manager so as not to delay the work. <br />The following items must be observed and approved by the PROJECT MANAGER before <br />proceeding with additional work: <br />Item 2. Trash removal -Grassy Gap <br />1. Disposal method prior to work <br />Item 3. Equipment Rental <br />1. All hours <br />Item 5. Road Base <br />1. Road base delivery prior to spreading <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.