progress payment after completion of the work described above for mobilization. Payment of <br />one-third of the lump sum price will be made with the final progress payment for the work if <br />demobilization has been completed. If the price bid for mobilization and demobilization is <br />greater fifteen percent (15%) of the total contract price, invoices supporting the mobilization <br />costs will be required before payment is approved. <br />ITEM 2 Trash Removal <br />Off of a previously operated haul road is an unmaintained road which leads to an area <br />requiring the removal of various objects. The unmaintained road has slumped and requires <br />road improvement for approximately 100 I.f. Trash removal consists of the following: <br />- 1 - 12'diameter, 18' high steel tank presumably used for either petroleum products or <br />water; <br />- associated 2" diameter piping with the above steel tank approximately 100' total <br />length; <br />- 1 - 20' length, 1 - 15' length 16" diameter unraveled CSP; <br />- 2 - 8'd off highway truck tires; <br />- partially buried small steel frame approximately 6' wide x 12'length; <br />- 3 steel barrels; <br />The above items will either be salvaged or properly disposed off at a County approved <br />landfill site. The method of disposal must be approved by the Project Manager prior to <br />disposal. The Contractor will submit written documentation as to what disposal method was <br />used. After removal of the trash the site will be revegetated. Revegetation will be <br />performed on all azeas disturbed and/or compacted during trash removal work including the <br />general area around the large steel tank according to the Revegetation Specifications (20.0) in <br />the General Bid Specifications. Commercial fertilizer or manure may be used for this <br />project. Seed will be supplied by the OWNER. The CONTRACTOR will supply the <br />fertilizer, certified weed free mulch, equipment for chiseling, fertilizer application, seeding, <br />mulching, and crimping. <br />Measurement and Payment <br />Payment for this item will be reflected in a lump sum bid under Item 2 on the Bid Schedule. <br />This lump sum bid will cover payment of all costs for accessing excavation, loading, <br />transport, documented disposal methods of the above listed trash and revegetation. There will <br />be no measurement for payment. Payment shalt be as this task is completed and approved by <br />the PROJECT MANAGER. Payment for this task shall be made only for that amount shown <br />under Item 7 of the Bid Schedule. Any or all incidental costs incurred by the <br />CONTRACTOR shall be reflected in each Bid Item or shall be paid at the CONTRACTOR'S <br />expense. <br />5 <br />