I <br />6 <br />i <br />EXISTING ASPHALT <br />DRIVE - -� <br />TEMPORARY EXCAVATION FOR <br />TUNNEL ACCESS TO POUR <br />CONCRETE <br />EXISTING TUNNEL <br />CONCRETE BULKHEAD <br />CORRUGATED METAL PIPE <br />15' -0 "d± ' \j <br />/ REMOVE AS REQUIRED TO <br />INSTALL BULKHEAD <br />A <br />EXIST. TUNNEL DRAINAGE ROCK - <br />` REMOVE AS REQUIRED TO INSTALL <br />BULKHEAD <br />EXIST. TUNNEL PERFORATED <br />DRAIN PIPE - SEE 3/S2 <br />EXIST. SUB -GRADE DRAIN PIPE <br />- SEE 3/S2 <br />ACCESS TUNNEL BULKHEAD <br />SCHEMATIC <br />X31 DRAIN MODIFICATION <br />1/2" = V -0" <br />CORRUGATED METAL <br />PIPE (CMP) - \ <br />/071 BULKHEAD SECTION <br />REMOVE EXISTING FLOOR SLAB <br />AND DRAIN ROCK AS REQUIRED <br />NEW BULKHEAD - SEE 2/S2 <br />EXIST. TUNNEL FLOOR SLAB <br />EXIST. TUNNEL DRAINAGE ROCK <br />EXIST. 6 "0 TUNNEL PERFORATED <br />DRAIN PIPE <br />EXIST. CORRUGATED METAL PIPE <br />NEW 90' 6 "0 CONNECTION PIPE <br />-FIT TO EXIST. PERFORATED PIPE <br />AND EXIST. SUBGRADE DRAIN PIPE <br />- LOCATE UP -SLOPE FROM BULKHEAD <br />EXIST. SUBGRADE DRAIN PIPE - <br />LOCATED AT t OF ACCESS TUNNEL <br />REMOVE PORTION OF <br />CMP AS REQUIRED TO <br />POUR CONCRETE FROM <br />ABOVE <br />UNREINFORCED CONCRETE <br />BULKHEAD <br />WOOD FORMS - DESIGN <br />BY CONTRACTOR - LEAVE <br />IN PLACE AFTER CONCRETE <br />PLACEMENT <br />EXISTING CONCRETE SLAB <br />ON GRADE - REMOVE AS <br />REQUIRED FOR BULKHEAD <br />INSTALLATION - SEE 1 /S2 <br />COMMENDED CONSTRUCTION SEQUEN <br />1. INSTALL STEEL BEAMS, DECK, AND REINFORCING OVER <br />FLOOR OPENINGS AS SHOWN ON PLAN. FORM AND <br />PLACE PHASE I CONCRETE TO DEPTHS SHOWN. <br />2. SAW -CUT ACCESS HOLES 3N EXISTING SLABS AT ELEVATIONS <br />9158' -0" AND 9175' -6" AS INDICATED ON DRAWINGS. <br />TOP SURFACES, OLD AND NEW. SEE PLAN NOTE NO. 7, SHEET S1. <br />3. INSTALL FILL MATERIAL IN ALL OPENINGS INDICATED ON PLAN. <br />USE NON -ACID GENERATING FILL MATERIAL PROVIDED BY <br />OWNER. BEGIN BY FILLING CHAMBER BETWEEN ELEVATIONS <br />9138' -0" AND 9158' -O" SOUTH OF GRID 02" <br />4. CONSTRUCT BULKHEAD IN SC1 CONVEYOR TUNNEL AS SHOWN <br />ON DETAIL 1, SHEET S2. <br />5. FORM AND PLACE PHASE II CONCRETE. <br />6. INSTALL CONCRETE PROTECTIVE COATING OVER ALL CONCRETE <br />7. COVER ENTIRE AREA ABOVE CRUSHER SLAB WITH 3' -0" <br />EARTH FILL MATERIAL. <br />S. REVEGETATE AREA. <br />EXISTING TUNNEL DRAINAGE <br />ROCK - REMOVE AS REQUIRED <br />- SEE 1/S2 <br />TYPICAL SLAB <br />REINFORCING - <br />SEE 4 /S1 - <br />in - 1' -0" <br />ADDITIONAL <br />TRANSVERSE REINF. <br />4 - #10 ® 6" O.C.- <br />FACE OF WALL BELOW <br />FACE OF WALL <br />6" EXIST. CONC. PILASTER <br />Q <br />CV O Z?Z <br />0 <br />I O O W��ZU� <br />i\ OV000 <br />co ? �ga�7d�a <br />N � <br />LONGITUDINAL REINFORCING <br />AT PILASTERS - #10 AT 6" <br />O.C. (2 - #10 PER DECK <br />2' -0" 3' -3 "t FLUTE AT DECK CONDITION) <br />SLAB REINFORCING PLAN AT PILASTER <br />SLAB PLAN NOTES: 1/4' <br />1. TYPICAL AT ALL EXIST. CONCRETE PILASTERS <br />ALONG GRIDLINES A & E. <br />GENERAL NOTES <br />GENERAL NOTES <br />1. Contractor shall field measure and verify all existing conditions and dimensions <br />at job site. <br />2. in case existing conditions or dimensions vary from those shown on drawing, <br />Contractor shall notify the Engineer so proffer adjustments can be made. <br />3. The requirements of the latest edition of OSHA Construction Standards" shall <br />be complied with by all contractors, fabricators and suppliers. <br />CONCRETE GENERAL NOTES <br />1. Material and workmanship shall be in accordance with the requirements of <br />"Building Code Requirements for Reinforced Concrete" (ACI 318, latest edition). <br />2. All concrete shall have a minimum compressive strength (f c) of 4500 psi at <br />the age of 28 days. <br />3. All concrete shall contain 3/4" maximum size aggregate. <br />4. Reinforcing bars shall be deformed bars and shall conform to ASTM A -615, <br />Grade 60, except as noted. All bars are to be epoxy coated per ASTM A775. <br />5. Bar bending details and placing drawings shall be in accordance with the <br />"Manual of Standard Practice for Detailing Reinforced Concrete Structures" <br />(ACI 315, latest edition). <br />6. Provide bar supports and spacers to place all bars in proper location, and <br />wire adequately at intersections to hold bars firmly in position while concrete <br />is placed. <br />7. Bar supports and spacers which rest on or against exposed surface shall be <br />hot - dipped or galvanized. <br />8. Continuous bars shall lap and dowels shall project adequately to provide a <br />Class A splice, but not less than 12 inches unless noted otherwise. <br />9. Do not splice at maximum stress locations. <br />10. Where lop splice locations of horizontal bars are not specifically noted on <br />the drawings, lap splices are to be staggered. <br />11. Concrete cover for reinforcement (unless otherwise noted): <br />A. Concrete poured against earth ............ ...... 3" <br />B. Concrete poured in forms but exposed to weather or earth <br />(1.) #5 bars or smaller ........................... 1 1,2" <br />2 ) Bars larger than J'5 ......................... 2 <br />12. All cement used shall be "Modified" Type 11. <br />13. All concrete shall have a minimum cement content of 470 lbs. per cubic <br />yard unless otherwise specified. <br />14. Calcium Chloride shall not be added to concrete. <br />STRUCTURAL STEEL GENERAL NOTES <br />1. All steel shall conform to the "Standard Specification for Structural Steel" ASTM <br />Designation A36, latest edition, except as noted otherwise. Wide flange and <br />WT sections shall conform to ASTM Designation A992. Steel pipe shall conform <br />to ASTM Designation A53 (Type E or Type S), Grade B. Steel tubing shall <br />conform to ASTM Designation A500, Grade B. <br />2. All detailing, fabrication and erection shall conform to AISC "Specifications for <br />the Design, Fabrication and Erection of Structural Steel for Buildings ", and the <br />AISC "Code of Standard Practice for Steel Buildings and Bridges ", latest editions. <br />3. All weldina shall be done by certified welding operators, who each have in their <br />possession current evidence of passing the American Welding Society Standard <br />Qualifications Tests" as detailed in AWS D1.1. Welds shall conform with AWS <br />Structural Welding Code" (AWS D1.1), latest edition. <br />4. Weld sizes not otherwise shown shall be minimum continuous 5/16 inch fillet <br />welds. <br />5. All welding shall be done with AWS A5.1 or A5.5 E70 XX electrodes unless noted <br />otherwise. <br />6. All steel members shall be coated with ARC St spray applied polymer composite <br />per manufacturer's instructions. <br />PLAN AT T.O.C. EL. 9158' -0f1 <br />1/8. = 1' -0" <br />rods - rssucs <br />KO. I DIME I D>l;9CR1MON <br />fig JC. BAVR <br />& ASSOCUTES. INC. <br />cO:1SLUNG ENOIKERS <br />1720 14TH STREET. sUnE 101 <br />COMM, (03) 44 -9121 <br />FAx: (303) 415 -1070 <br />COVISS Tr I Thew amrim a and Ike <br />ddP am sad It on Yam rameft 00 1e <br />ae <br />= a of Ws alum , d awed be aced <br />eL!hna!, ux aoxwt of a the The <br />deeaLYs * W .ebd foe vKhae <br />the dad of tko erg. <br />a e`necdo - ah& be .e:97ed an at by the <br />oomtradw -dare 9roceedift vM the sort. <br />WU CRUMB-1-1 <br />PROLEOM <br />DUPE: <br />DiRL=: <br />ClECOV. <br />08/14/01 <br />JCB <br />DRCC'D.'(i 7=: <br />DLL DU AILS A1413 <br />CIE14113 tAL 14OTlM <br />A00M TUIZVV <br />PROJ= iro: 00054 <br />DRLr= NO. n�,Y ^ /JJ <br />v& <br />III!II!I�illrlri�ll,,;,riiilll <br />23155 <br />