Laserfiche WebLink
7.0 DRAINAGE CONTROL SYSTEM RECONSTRUCTION <br />7.1 Description <br />This specification covers all work required to re-establish drainade <br />through the regraded portal bench area, the sediment pond access road, <br />and along the highway and rail line. <br />7,2 Execution <br />The CONTRACTOR shall cerform all work and provide all the materials <br />necessary to reconstruct drainage control within the west mine area in <br />accordance with the plans and sceci fi cati ohs set forth below. <br />Culvert Removal/Modification <br />The west mine area contains 8 CMP type culverts which are <br />shown and labeled CMP-1 through CMP-8 on Exhibit 3A, The <br />final configurations of these culverts after specified work <br />has been completed are shown on Exhibit 4A. Cross sections <br />of the drainage channels to be constructed as part of the <br />culvert modification work are shown on Exhibit 6D. Work to <br />be performed on these culverts is as follows: <br />CMP-1 This culvert is to be left in place. The portion of the <br />drainage channel immediately above the inlet end shall be <br />widened approximately 2 ft. on both sides and deepened <br />approximately 1 ft. for a total distance of 5 ft. above the <br />inlet end. The enlarged area shall be lined on the bottom <br />and sides using 1 ft. minimum diameter durable rock riprao. <br />CMP-2 The inlet end and portion of the culvert passing beneath the <br />highway shall be left in place. The secondary vertical inlet <br />to this culvert near the edge of the highway pavement on the <br />south side shall be removed, with the subsequent culvert <br />extension which basses through the fill to CMP-5 being either <br />removed or otherwise collapsed or filled in below final grade <br />and covered with non-coal fill material. The area <br />immediately surrounding the new outlet end shall be graded <br />sufficiently to prevent any blockage of outflow, and the <br />hillsloce immediately beneath the new outlet for a distance <br />of 10 ft. from the culvert end and shall be graded to form a <br />trapezoidal shaped outfall channel 3 ft. deep and 3 ft. wide, <br />(bottom width) with 2h: 1V side slopes as shown on Exhibit <br />6D. The channel bottom and sides shall be lined with minimum <br />1 ft. diameter durable rock riprap. The specified channel <br />depth and width are the finished dimensions with riprap in <br />place; excavated dimensions will be greater in order'to <br />provide space for riprap. The small highway drainage ditch <br />or swale on the south side of the highway shall be routed <br />such that runoff in the ditch is directed to the top of the <br />trapezoidal channel. <br />-19- <br />