My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL34764
DRMS
>
Back File Migration
>
General Documents
>
GENERAL34764
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:56:04 PM
Creation date
11/23/2007 8:02:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981037
IBM Index Class Name
General Documents
Doc Date
10/7/1994
Doc Name
GEC PROJECT RN-MINES-322
From
DMG
To
COLO WEST LEASING
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_. <br />August 26, 1994 letter based upon your feeling <br />that this small berm was an extra work item. <br />We are giving you the benefit of the doubt and <br />will pay $90.00 for 1 hour of dozer time. <br />b. South End Ditch, Pad for Riprap, Shaping <br />of the Ditch-$1230.00. <br />bb. In reference to our letter of August 26, <br />1994, The Division has reconsidered payment <br />for Item B-1, South end ditch and shaping of <br />the ditch and will pay for this. We agree <br />that you could interpret that this was deleted <br />by Change order Number 2. Please provide <br />documentation for the amount of time spent <br />with the dozer shaping this area. The <br />Division's determination, Item B-2, pad for <br />riprap, remains unchanged and no additional <br />payment will be made for this item. <br />c. 200 Cubic Yards of Stockpiled Riprap- <br />$5616.00 <br />cc. In reference to our letter of August 26, <br />1994, Item C-1 should also include the fact <br />that the rock at this location came from the <br />north end of the east pit, immediately south <br />of the current pile location. The bulk of <br />this rock does not meet specification and in <br />fact was reject from the Contractors sorting <br />operations to obtain rock for other portions <br />of the project work. The Division's <br />determination to not pay for this reject <br />material remains unchanged. The Division will <br />pay for whatever remains of the 45 cubic yards <br />of specification grade material that remains <br />on site after completion of the riprap portion <br />of the Chen's Hill Ditch. Payment will be at <br />the rate of $28.00 per cubic yard for any <br />excess specification grade material. <br />d. Concrete Drop Structures-$800.00 <br />dd. In reference to our letter of August 26, <br />1994, Item D-1. The Division's determination <br />remains unchanged for this item, and the <br />Division will pay the Contractor $400.00. <br />e. Interest $550.00 <br />ee. In reference to our letter of August 26, <br />1994, Item E-1. The Division's determination <br />remains unchanged for this item, at this time. <br />
The URL can be used to link to this page
Your browser does not support the video tag.