My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL34709
DRMS
>
Back File Migration
>
General Documents
>
GENERAL34709
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:56:03 PM
Creation date
11/23/2007 8:01:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981207
IBM Index Class Name
General Documents
Doc Date
10/5/1981
Doc Name
SUPPLIMENTARY DATA-DITCH RELOCATION
From
JEROME F GAMBA P E L S
To
BLUE PIT ZEMLOCK & SON INC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />999 <br />JEROME F. GAMBA P.E.-L.S. miNiNCacso~ocica~ <br />CONSULTING ENGINf_ER ENGINEERING <br />P.O. Box 1458 <br />Glenwood Springs, oFFict 303 945-7749 <br />Colorado 81601 Ronne 303 945-59!13 <br />BLUE PIT--ZEMLOCK AND SnN, INC. 10/5/81 <br />SUPPLIMENTARY DATA--DITCH RELOCATION <br />As a part of the mining plan for the Blue Pit, it will be <br />necessary to relocate the feeder ditch and ultimately, the Basin <br />ditch as illustrated on the exhibits. The mining of area number <br />one will create topography in which this relocation can be done. <br />The relocated ditch will be designed and constructed with hydraulic <br />characteristics which will insure uninterupted flo~o of adjudicated <br />water in the basin ditch. It is probable that the relocated ditch <br />will be constructed in a material with high porosity and permeability <br />and will therefor require that it be sealed and/or lined to reduce <br />ditch loss to a minimum. Adequate working space will be created <br />along the ditch to provide for convenient maintenance and cleaning,. <br />Figure 6 of exhibit three illustrates the post-mining topography <br />of the project and shows the approximate location of an inverted <br />siphon which will transport the Basin ditch flow across the mined <br />out area to the existing Basin ditch west of the project. <br />This siphon will be designed and constructed to carry the full <br />adjudicated flow of the Basin ditch. It will be constructed of <br />a smooth wall pressure pipe designed for long life and minimum <br />maintenance and will be equipped Faith a valved clean-out at its <br />lowest point to facilitate flushing to remove accululated <br />sediment. The inlet and outlet will be fitted caith grating to <br />prevent access L-o the pipe by people or animals. <br />
The URL can be used to link to this page
Your browser does not support the video tag.