II. Project Work Description <br />Project Summary <br />The Hawk's Nest Mine Site has been ordered to be reclaimed by the Colorado <br />Department of Natural Resources, Mined Land Reclamation Board (the Board). <br />The operator of the mine fai]ed to comply with regulatory requirements for an <br />extended period of time, resulting in revocation of the mining permit and <br />forfeiture of the reclamation performance bond being held by the Mined Land <br />Reclamation Division (the Division). The Board has directed the Coal <br />Regulatory Section of the Division to secure reclamation of the site using <br />funds obtained from the forfeited performance bond. <br />The Hawk's Nest mining operation is comprised of four separate disturbed <br />areas: 1) East Mine; 2) West Mine; 3) Silo Area; and 4) Refuse Disposal Area. <br />Revegetation work to be accomplished under this contract is limited to the <br />West Mine. Facilities demolition and earthwork were completed at this site in <br />the spring and summer of 1990 under Bid No. RN-GOAL-MINES-2. Facilities <br />demolition and earthwork have not been completed at the East Mine, the Silo <br />Area, or the Refuse Disposal Area and revegetation of these areas is not <br />included under this contract. Project work will involve seedbed preparation, <br />seeding, fertilizing, mulching and installation of erosion control blankets. <br />Adequate rights-of-way needed for access to the project area and within the <br />working area limits specified for this project have been acquired by or on <br />behalf of the OWNER. <br />The West Mine area is located within the S1/2 of Section 10, T13S, R90W. <br />III. Project Work Specifications <br />1.0 Mobilization/Demobilization <br />1.1 Description <br />This specification covers the CONTRACTOR'S operations for: <br />a. Payment of premiums for bonds and insurance acquired specifically <br />for the construction of this project, including premiums for <br />performance and payment bonds; <br />Movement of personnel, equipment, operation supplies, and <br />incidentals to the project site, but not within the work limit area; <br />c. Preparatory work at the construction site; <br />d. Demobilization of CONTRACTOR'S equipment and all other facilities, <br />final project clean-up, and for all other work for which payment is <br />not otherwise provided for under the contract. <br />-3- <br />