Laserfiche WebLink
3.0 Equipment Rental <br />3.1 <br />3.2 <br />Description <br />Since several months will have elapsed between completion of regrading <br />and initiation of revegetation at the West Mine, some erosion repair work <br />may be necessary to eliminate rill and gullies prior to commencement of <br />seedbed preparation. This specification covers the furnishing and <br />operation of equipment for necessary erosion repair and other <br />supplemental earthwork as directed by the PROJECT MANAGER. <br />Equipment <br />All equipment shall be of the type and equipped as specified in the <br />Special Conditions and on the Invitation and Bid. Mounted or attached <br />equipment shall be that customarily manufactured for the respective size <br />of equipment being offered. Size will be determined by maximum flywheel <br />horsepower ratings at sea level and are the minimum size that shall be <br />furnished and operated. <br />Equipment must be in good operating condition and must be maintained in <br />good operating condition by the CONTRACTOR throughout the life of the <br />contract. The PROJECT MANAGER shall be the sole judge of whether <br />equipment is or is not in "good operating condition". <br />Equipment of any size above the minimum flywheel horsepower may be <br />furnished subject to the approval of the PROJECT MANAGER. In order to <br />evaluate the bids for various sizes of equipment proposed to be furnished <br />by the bidders, the unit price inserted in the bid must be adjusted. The <br />bidder may figure the unit price to insert in the Invitation and Bid by <br />doing the following computation for the applicable bid item: If the <br />desired unit rate to be received is 570.00 per hour fora 215 FHP <br />bulldozer and the minimum FHP requested is 140, then multiply 570.00 X <br />140/215 = ;45.50 per hour. Use that calculated amount (545.50 in the <br />example) as the unit price on the Invitation and Bid. If the CONTRACTOR <br />plans to furnish a machine other than the minimum FHP listed on the <br />Invitation and Bid, he must write the FHP of the machine, in ink, under <br />the bid item in the Invitation and Bid. <br />After the successful bidder has furnished evidence of the FHP capacity of <br />the equipment to be used, the amount bid for Equipment Rental will be <br />modified by reversing the above procedure to reflect the unit price <br />desired by the CONTRACTOR with a Corresponding reduction in the quantity <br />of hours required. This modified hourly rate and number of hours will <br />appear on the Purchase Order. <br />The number of hours indicated in the Special Conditions and on the <br />Invitation and Bid Sheet are estimated. It is impossible to determine in <br />advance the actual number of hours that the equipment rental will be <br />necessary. <br />-10- <br />