My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL34650
DRMS
>
Back File Migration
>
General Documents
>
GENERAL34650
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:56:01 PM
Creation date
11/23/2007 8:00:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
General Documents
Doc Date
1/18/1983
Doc Name
MEMO BEAR III MEETING STIPULATION 11
From
MLRD
To
DAN MATHEWS
Permit Index Doc Type
STIPULATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />DEPARTMENT OF NATURAL RESOURCES 999 <br />D. Monte Pascoe. Ezecuhve Director <br />MINED LAND RECLAMATION DIVISION <br />DAVID C. SHEITON Director <br />Richard D Lamm <br />Governor <br />MEMORANDUM <br />18 J a~y 1983 <br />T0: Dan f4athews 1 -g-- <br />FROM: Jim Pendleton 1~y~ttJJ~~~_~~ <br />RE: Bear No. III Mee Stipulation No. 11 <br />In your absence, today, I met with Eldon Strid concerning <br />compliance by Bear Coal Company with Stipulation No. 11 of their existing <br />premit for the Bear No. III mine. Stipulation No. 11 required the <br />installation and monitoring of a monumentation system to verify that the <br />surface facilities area was stable. <br />Eldon and I discussed a preliminary proposal to install monuments <br />to comply with our requirements. They propose to install several driven <br />monuments above and below the access road. They also proposed to install <br />monument points on both the tieback wall at the main portals and the <br />crib-lock wall at the fan portal. I also requested the installation of a <br />hub on the massive sandstone bed above the main portal. Eldon also <br />proposes to install monuments in the old landslide deposits above both <br />the fan portal and the access road switchback. <br />Eldon proposed treat the company monitor the survey points <br />semi-annually. They intend to install the points within the next month <br />and will survey them immediately upon installation. Following that they <br />propose to survey the monuments once in the spring and once in the fall. <br />I stated that these proposals would be acceptable. I directed the <br />company to submit the final proposal to you, in writing. Eldon believes <br />that they will submit the proposal within the next few weeks. <br />cc: Brian Munson <br />Document No. 0154E <br />423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203 Tel. (303) 866-3567 <br />
The URL can be used to link to this page
Your browser does not support the video tag.