Laserfiche WebLink
<br /> <br />Continuation of Item 8 <br />Coal Processing Waste and Non-Coal Processing Waste <br />_ During the first quarter_of 19.91, approximately 5500_cu, yds. <br />of non-£oxic, non-coal waste will be disposed of at the non-coal <br />waste disposal and scrap storage area (see map 10). All work will <br />be done in accordance with approved Technical Revision -.17. <br /> <br /> <br /> <br /> <br /> <br />C Ll <br />.~.. O J- i J. l <br />(Fevised 01/12/91) <br /> <br />