Laserfiche WebLink
• <br />DEPARTMENT OF NATURAL RESOURCES <br />David H. Getches, Executive Director <br />MINED LAND RECLAMATION DIVISION <br />DAVID C. SHELTO N, Director <br />R~chartl D. Lamm <br />Governor <br />DATE: September 4, 1985 <br />T0: Tom Gillis and McClane Canyon Permit File C-004-80 <br />FROM: M.S. Savage ~ver.~. <br />RE: September 3, 1985 Response to Stipulations by Salt Creek Mining <br />I have reviewed the responses to Stipulations 7, 8, 9 and 10 for the McClane <br />Canyon Mine submitted by Salt Creek Mining and have the following comments. <br />Stipulation 7 <br />This stipulation required Salt Creek Mining to use combined production data <br />from McClane and Munger in order to set a revegetation success standard for <br />vegetative production. A statement to this effect is in revised Section <br />3.4.9, though it is in connection with the annual monitoring plan. <br />Stipulation 8 <br />This stipulation required the setting of woody plant density success <br />standards. Salt Creek Mining has accepted the Division standards as proposed. <br />Stipulation 9 <br />This stipulation required the setting of a species diversity standard. The <br />permittee has adopted the proposed Division standard. <br />Stipulation 10 <br />This stipulation required development and initiation of an annual revegetation <br />monitoring plan. The plan submitted is acceptable to the Division. For <br />clarity, it is noted that the permittee need implement the monitoring only in <br />years 2-8 of the extended liability period. In years 9 and 10, a full scale <br />sampling program will be required prior to application for bond release. <br />For your information, I have compiled the following table on revegetation <br />success criteria at the McClane Canyon Mine. <br />423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203 Tel. (303) 866-3567 <br />iii iiiiiiiiiiiiiiii <br />