My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL34573
DRMS
>
Back File Migration
>
General Documents
>
GENERAL34573
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:55:59 PM
Creation date
11/23/2007 7:59:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981024
IBM Index Class Name
General Documents
Doc Date
6/16/1983
Doc Name
Proposed Decision and Findings of Compliance
Permit Index Doc Type
FINDINGS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-5- <br />DIVISION. COLORADO COAL MINING COMPAfVY, UTILIZING MAPS <br />DEPICTING THE ANNUAL SURVEYED CONFIGURATION DURING CONSECUTIVE <br />YEARS, SHALL DETERMINE THE ACTUHL OVERBURDEN SWELL AND BULKING <br />FACTORS ENCOUNTERED. THESE MAPS AND A REPORT PRESENTING THE <br />METHODOLOGY ANU RESULTS OF THIS ANALYSIS SHALL BE SUBMITTED TO <br />THE DIVISION FOR REVIEW AND APPROVAL ON AN ANNUAL BASIS. <br />COLORADO CONL MINING COMPANY SHALL CONTINUE THIS NNALYSIS ON AN <br />ANNUAL BASIS UNTIL THE DIVISION APPROVES ITS CESSATION IN <br />WRITING. SHOULD THESE DETERMINATIONS DISCERN ANY INACCURACY <br />WHICH AFFECTS THE ABILITY OF THE COMPANY TU ACHIEVE THE <br />PROJECTED POST-MINING TOPOGRAPHIC CONFIGURATION, THEN THE <br />COMPANY SHALL REVISE THE MINING AND RECLAMATION PLAN <br />APPROPRIATELY. THE FIRST ANNUAL REPORT SHALL BE DUE 12 MONTHS <br />AFTER PERMIT ISSUANCE. <br />Stipulation No. 12 <br />WITHIN 30 DAYS OF PRODUCTION OF THE FIRST COAL PROCESSING WASTE, <br />THE MATERIAL MUST BE SAMPLED NND ANALYZED FOR GEUCHEMICAL <br />CHHRACTERISTICS. THIS ANALYSIS SHOULD INCLUDE THE FULL SUITE OF <br />PARAMETERS WHICH IS REQUIRED BY THE DIVISION AT THAT TIME, AS <br />SPECIFIED IN CURRENT DIVISION GUIDELINES FOR OVERBURDEN CHEMCIAL <br />PARAMETERS. ALL ANALYSES WILL BE SUBMITTED TO THE DIVISION <br />WITHIN 30 DAYS OF SAMPLING. <br />Stipulation No. 13 <br />PRIOR TO CONSTRUCTING AIVY HAUL ROADS THE OPERATOR MUST SUBMIT <br />ANU HAVE APPROVED, DESIGNS WHICH SHOW THAT ALL CULVERTS HAVE <br />BEEN SIZED TO HANDLE THE 10 YEAR, 24 HOUR PRECIPITNTION EVENT. <br />Stipulation No. 14 <br />PRIOR TU CONSTRUCTION OF SEGMENT 40+005 TO 44+005 OF HAUL ROAD <br />A, THE OPERATOR SHALL SUBMIT AND HAVE APPROVED DESIGNS FUR THE <br />MAITLAND ARROYO CROSSING. <br />Stipulation No. 15 <br />WITHIN 60 DAYS OF CONSTRUCTION OF A HAUL ROAD THE OPERATOR SHALL <br />SUBMIT TU THE DIVISION A CERTIFIED DOCUMENT. THE DOCUMENT SHALL <br />STATE THAT THE HAUL ROAD WAS CONSTRUCTED IN ACCORDNNCE WITH THE <br />PLAN APPROVED IN THE PERMIT APPLICATION AND SHALL BE CERTIFIED <br />BY A QUALIFIED REGISTERED PROFESSIONAL ENGINEER. <br />Stipulation No. 16 <br />WITHIN 30 DAYS OF THE LAST DATE OF THE PUBLIC COMMENT PERIOD <br />REQUIRED BY RULE 2.07.4(3)(a), THE CURRENT BOND SHALL BE UPDATED <br />OR REPLACED TO EFFECTIVELY INCREASE THE RECLAMATION BOND HELD BY <br />THE DIVISION TO $345,260.00. <br />
The URL can be used to link to this page
Your browser does not support the video tag.