Laserfiche WebLink
' ., +Fy In :I •~';e .. ... <br />ni.. I~ • • <br />,~y ~ <br />.~ ~ <br />stockpile within five years of the date of this Stipu: <br />Schmahls will annually advise the Board of their dili! <br />attempting to remove the stockpile. Providing Schmah: <br />diligence in attempting to~remove the stockpile and p~ <br />the stockpile is not totally removed within five year: <br />Board may grant an extension of an additional three y~ <br />which to remove the stockpile. Such extensions shall <br />unreasonably withheld~`~At the end of the three year <br />extension, Schmahls shall grade, sr_ulpt, seed, plant, <br />otherwise reclaim the stockpile within the next year. <br />Schmahls may evidence diligence in eliminating the stc <br />by demonstrating their contact annually with at least <br />Forest Service, Bureau of Land Management, State Iligh~ <br />Department, Comity Road Department, or other private <br />entities, regarding the sale of the material for projt <br />being undertaken by those entities. <br />ation. <br />ence in <br />s show <br />oviding <br />the <br />acs in <br />not be <br />and <br />the <br />ile <br />b. No additional stockpiling of any nature hall be <br />allowed in the area of the existing stockpile. <br />c. Removal of the stockpile as Phase II of his <br />Stipulation may be undertaken concurrently with Phase I <br />above. <br />7. Phase III of this Stipulation involves minin in tl~e <br />area designated as Phase III on Exhibit "A". Extract ve <br />operations in Phase III may only be undertaken as fol ows: <br />a. No extraction in Phase III shall be unde taken <br />until extraction in Phase I and removal of the stockp le in <br />Phase II are substantially complete. <br />b. Mining and extraction in Phase III shall be <br />undertaken pursuant to 'the Conditional Use Permit iss ed by <br />Resolution MCM 84-29. The parties hereby defer <br />interpretation of said permit until notice is receive from <br />Schmahls by the Board of Schmahl's intent to commence with <br />Phase III. <br />8. Physical staking of the entire site shall be <br />accomplished as soon as possible after execution of t}is <br />Stipulation to identify boundaries of existing and pr posed <br />disturbance and buffers. A seventy five (75) foot <br />undistrubed buffer shall be maintained by Sclunalils ne t to <br />all drainages, except foz• that drainage presently enc oached <br />upon by the existing stockpile, which drainage shall low and <br />then be reclaimed as a portion of Phase III. A fifty {50) <br />foot undisturbed buffer shall be maintained by Schmah s next <br />to Bureau of Land Management property..A twenty five (25) <br />foot buffer shall be maintained by Schmahls along Hig way <br />191. <br />9. All reclamation plans and activities for eac phase <br />shall be timely reviewed and approved by the Tri-Rive <br />