Laserfiche WebLink
a . i <br />i • <br />Mr. Bob Nondorf <br />the time the original bid package was <br />the pre-bid meeting date. Amendment <br />drawings which provide more accurate <br />estimates. <br />-z- <br />November 8, 1989 <br />sent to purchasing and one week prior to <br />No. 1 also contains some additional <br />data regarding earthwork quantity <br />Amendment No. 2 was sent out one day after the pre-bid meeting. This <br />amendment contains corrections to drawings and special condition sections to <br />account for the additional removal of power poles and a few other mining <br />related materials that occurred during the week prior to the pre- bid <br />meeting. In addition, this amendment includes a revised plan for ripping work <br />based on contractor comments, as well as clarifications to the regrading and <br />drainage reconstruction plans. Also, a disclaimer regarding any future <br />removal of salvageable materials from the site occurring between the time of <br />the pre-bid meeting and the issuance of the notice to proceed has been added <br />to the amendment based on contractor comments. <br />Please contact me at 866-3567 if you have any questions, comments or concerns. <br />TDG/yjb <br />1133E <br /> <br />