My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL34426
DRMS
>
Back File Migration
>
General Documents
>
GENERAL34426
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:55:54 PM
Creation date
11/23/2007 7:56:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983194
IBM Index Class Name
General Documents
Doc Date
2/28/1990
Doc Name
RECORD OF DECISION WOLF RIDGE CORP MINE PLAN FOR A NAHCOLITE SOLUTION MINE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9. A detailed subsidence monitoring system will be submitted by the '. <br />designated operator/lessee to detect and determine: <br />a. Extent of caving <br />b. Impact on Mahogany Zone due to caving and/or pillar failure <br />c. Any surface subsidence <br />d. Actual cavity configuration <br />This design will be submitted to the authorized officer for approval. The <br />authorized officer will approve or approve with modifications or <br />disapprove the design within 30 days of receipt. The subsidence <br />monitoring system will be in operation prior to sodium production and will <br />continue for at least 3 years fallowing project cessation, or longer if <br />conditions warrant, as determined by the authorized officer. <br />SUBMITTALS <br />1. The following information shall be submitted to the authorized officer <br />within 30 days after such data is obtained: <br />a. One copy of all hydrologic data obtained from drilling and monitoring <br />b. Copies of all downhole logs <br />c. Fluid injection and production volumes and corresponding pressures <br />d. The daily 5 1/2-inch by 8 5/8-inch annular pressure readings <br />e. Copies of the mud check sheets <br />f. Weekly monitoring data of fluid levels in the 13 3/8-inch by 8 <br />5/8-inch annulus <br />2. The Cement Evaluation Tool (CET) log or equivalent shall be submitted to <br />the authorized officer within 10 days after logging. <br />3. Production from a cavity shall be stopped if production from the cavity <br />meets the calculated production, based on the assumed cavity configuration. <br />4. Specific details and specifications for epoxy spray coatings or other <br />remedial measures of minor casing leaks will be provided to the authorized <br />officer for approval before initiating well construction, <br />5. The authorized officer will be notified of all spills, leaks and pressure <br />losses within 24 hours of the occurrence during the week, or first thing <br />Monday morning if the occurrence is on a weekend. <br />RECLAMATION <br />1. Interim reclamation measures may be necessary before project cessation, as <br />determined by the authorized officer. In addition, erosion control <br />measures may be necessary, as directed by the authorized officer. <br />2. Topsoil will be stripped to appropriate depths on all areas that will be <br />disturbed by the proposed action and will be stockpiled for future <br />restoration, as directed by the authorized officer. Topsoil stockpiles <br />will be fenced with single strand wire and will be appropriately shaped, <br />i <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.