My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-06-07_GENERAL DOCUMENTS - C1981022
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981022
>
1996-06-07_GENERAL DOCUMENTS - C1981022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2021 5:47:50 AM
Creation date
11/23/2007 7:56:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
General Documents
Doc Date
6/7/1996
Doc Name
Midterm Review Findings Document
Permit Index Doc Type
Findings
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
x <br /> 32 Revise Bear Canyon Reclamation Time Approved 9/15/95 <br /> Table <br /> 33 Rip-Rap Repair in Bear Canyon Approved 10/6/96 <br /> 34 Elk Creek Coal Stockpile Approved 12/15/96 <br /> 35 Bear Canyon Reclamation Approved 4/23/9 <br /> Stipulation Summary <br /> There were three stipulations (14 , 16, & 17) attached to the Permit <br /> Renewal No. 2 . Findings Document which was prepared on September <br /> 10, 1993 . There were two additional stipulations (18 & 19) <br /> resulting from the approval of revisions . These stipulations are <br /> restated here along with their current status. <br /> Stipulation No. 14 <br /> Somerset Mining Company must submit a mine plan change to, and <br /> receive approval from, all applicable state and federal agencies <br /> before pulling pillars form the B seam underneath any unmined C <br /> seam areas with less than 1, 500 feet of cover. <br /> The stipulation is still active. <br /> Stipulation No. 16 <br /> The operator will , pursuant to Rule 4 . 10 . 2 (20 (b) , submit to the <br /> Division as part of the quarterly coal mine waste pile inspection <br /> report, compaction test results for that pile. Testing will take <br /> place on an as-needed basis, depending on the rate at which the <br /> pile receives coal mine waste, to ensure stability of the pile. <br /> This stipulation is still active . <br /> Stipulation No. 17 <br /> All issues identified in the Division ' s permit renewal adequacy <br /> letter of June 11 , 1993 and included in the SAC July 26 , 1993 <br /> adequacy response/Technical Revision No. 17 application will be <br /> addressed to the Division 's satisfaction by October 15 , 1993 . <br /> This stipulation has been complied with through the submittal of <br /> Technical Revision 17 which addressed all outstanding issues with <br /> the exception of those identified in Stipulation 18 . Stipulation <br /> 17 is therefore terminated. <br /> Stipulation No. 18 <br /> SAC must, by July 30, 1994 , locate and mark the location of the <br /> following wells and bore holes; E-25A, B-4 , B-5, B-7 , B-8 , H-29 , H- <br /> 30. <br /> -5- <br />
The URL can be used to link to this page
Your browser does not support the video tag.