Laserfiche WebLink
J .. ~. <br />Bob Nondorf - 2 - April 4, 1990 <br />Additionally, 2 sections of the Special Conditions were amended as shown on <br />the attached Amendment document to allow the CONTRACTOR to 1) Be able to <br />use equipment committed to this job on other work as long as work on this <br />project is completed on schedule; and 2) Be able to bury portions of <br />demolished structures on site if desired. Also, a copy of the sample daily <br />job log was attached to the amendments as this document was left out of the <br />original bid package. <br />TDG/yjb <br />5794E <br />