Laserfiche WebLink
<br />COOLEY RESERVOII2 AND FULTON WILDER+E AREA PIT <br />(Revised 07/09/99) <br />EXHIBIT S -PERMANENT MAN-MADE STRUCTURES <br />The purpose of this Exhibit is to specifically identify permanent man-made structures either off-site <br />or on-site within the permit azea that are within 200' of any proposed mining. The following man- <br />made structures are: <br />Public Service Company of Colorado (PSCo.) -Transmission Towers <br />A major transmission power line crosses the middle of both sides of the property between <br />Parcels A and B on the east side of the river and between Parcels D-2 and D-3 on the west <br />side of the river. In total there are 8 tower structures. The Slope Stability Analysis <br />determined that a setback of 50'is adequate to ensure that these structures would not be <br />impacted by mining. However, as the closest tower structures in Public Service's right-of- <br />way boundary is 50'± and the minimum setback from any property line to excavation is 35', <br />the nearest any excavation should come to any tower structure is 85'±, but no mining will <br />occur within 200' of the PSCo. towers without an agreement to do so from PSCo. that <br />is acceptable to the DMG. or acceptance by DMG of a revised Slope Stability Analysis <br />proposing a lesser setback than 200'. /tem #7 - Sorenson's comment <br />Fulton Ditch Company -Fulton Ditch, Spring Creek Seep Ditch, Headgate, Other Structures <br />The Fulton Ditch is Parcels A's and B's east boundary. The Slope Stability Analysis <br />determined that a setback of 50'is adequate to ensure that this structure would not be <br />impacted by mining, but per comments from the DMG, the mining setback will be 65' <br />from the inside top of the high bank of the Ditch. /tem #7 - Sorenson's comment The <br />Spring Seep Ditch on Parcel A is located on the northeast side of a small internal access road <br />within the property. Per the Slope Stability Analysis no mining would be allowed within 50' <br />of this Ditch, but because of the location of this internal access road, the nearest any <br />excavation should come to the Spring Creek Ditch on Parcel A is actually 75'+. The Spring <br />Creek Ditch also abuts Parcel C-], but no mining is proposed on Parcel C-l. The headgate <br />and other structures of the Fulton Ditch Company are within 200' of the permit boundaries, <br />but no mining or disturbance is proposed within 200' of these structures. <br />