Laserfiche WebLink
<br />Reclamation <br />Year Phase Relation to Mining Phases and Reclamation Activities <br />11-14 Phase 5 - Unless the Plant Site is continued to be operational by amendment of this <br />permit to mine property north of 104's Avenue or other adjacent properties <br />and utilize the Plant Site to process material from these additional areas, the <br />Plant Site Area and the area utilized for wash water will be Reclamation Phase <br />5. Final sloping and replacement of6-12"'± topsoil should begin within t year <br />of when all mining is completed in Mining Phase 4.Disturbed areas not <br />proposed as wetlands will be revegetated with non-irrigated grasses as <br />outlined on page 7. Areas of proposed wetland areas will be revegetated in <br />accordance with recommendations to be provided by the consultant on <br />wetlands. Any areas of the Plant Site not proposed for immediate industrial <br />use after removal of the Plant Site facilities will also be revegetated with the <br />same non-irrigated grass seed mixture as outlined on page 7. Thus the final <br />reclamation area is assumed to total approximately 30 acres, which consists <br />of 25± acres of the wash plant discharge area and 5+ periphery acres of the <br />former Site Plant area. Revegetation ofnon-irrigated grasses as outlined on <br />page 7 should be undertaken in the 11'r year and be fully established by the <br />14'" year. <br />Other considerations or standards involved in the reclamation plan are as follows: <br />No acid or other toxic forming materials are known to exist in the topsoil, <br />overburden, or aggregate material to be mined at the site. Refuse generated will be <br />collected in the appropriate containers and hauled to a solid waste transfer station or <br />landfill facility, and no waste or refuse will be disposed of on site. <br />2. At CAMAS's discretion, one private boat ramp may be constructed for each part of <br />the reservoir to allow inspection of the shore line and any inflow or outflow facilities <br />by the eventual owner of the reservoir. If constructed, a map identifying these <br />facilities shall be forwarded to the DMG at such time as they are determined. <br />3. At CAMAS's discretion, inflow and outflow facilities may be constructed to allow <br />filling and draining ofthe reservoir, and to transfer water between the two sides of the <br />reservoir. If constructed, a map identifying these facilities shall be forwarded to the <br />DMG at such time as they are determined. <br />