My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL34286
DRMS
>
Back File Migration
>
General Documents
>
GENERAL34286
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:55:50 PM
Creation date
11/23/2007 7:53:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
General Documents
Doc Date
8/7/1998
Doc Name
Midterm Review Findings Document
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C~ <br />Mid-Term Review <br />C~ <br />Golden Eagle Mine -Permit No. C-81-013 <br />This document presents the results of the Division of Minerals and Geology (Division) Mid-term <br />review of the Golden Eagle Mine operated by Basin Resources, Inc. This review was conducted <br />to fulfill the requirements of Rules 2.08.3, 2.06.2, 2.06.3, 2.06.5, 2.06.7, and 3.02.2(4). <br />Rule 2.08.3 requires that the Division conduct a review of each permit issued, prior to its <br />Mid-term (2-I/2 years). Based on this review, for good cause shown, the Division may require <br />reasonable revisions or modifications of the permit provisions to ensure compliance with the Act <br />and Regulations. <br />Rules 2.06.2, 2.06.3, 2.06.5, and 2.06.7 require that experimental practices, mountain top <br />removal variances, variances from approximate original contour (AOC), and variances from <br />contemporaneous reclamation, respectively, be reviewed by the Division where applicable during <br />the Mid-term review. <br />Rule 3.02.2(4) requires that the Division review the amount of the bond and the terms of <br />acceptance of the bond every 2-1/2 years. <br />The Mid-term Review of the Golden Eagle mim consisted of a review of the findings document, <br />the permit application and subsequent revisions, stipulations, enforcement actions, cost estimate <br />and other assorted permit files and information. <br />The document is organized as follows: Section I contains a brief history of the mine. Section II <br />contains a summary of permit actions. Section III is a review of the stipulations attached to the <br />permit. Section N is a review of the enforcement actions issued since Permit Renewal !t2 (RN- <br />02). Section V is a summary of the review and a discussion of any problems identified as a real[ <br />of this review which are required to be resolved. Section VI is a review of the Bond(s) and the <br />reclamation cost estimate. <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.