<br />Stipulation No. 14 <br />WITHIN 30 DAYS OF PERMIT ISSUANCE THE PERMITTEE SHALL INCORPORATE INTO THE <br />PERMIT DOCUMENT A DISCUSSION OF THE EXISTING STOCK WATERING POND. (THIS <br />DISCUSSION SHOULD INCLUDE THE SIZE OF THE POND, DESIGN AND CONSTRUCTION <br />DATA, CONSTRUCTION DATE). <br />Stipulation No. 15 <br />WITHIN 30 DAYS OF PERtdIT ISSUANCE THE PERMITTEE SHALL PROVIDE THE <br />DIVISION, TO BE INCORPORATED INTO THE PERMIT DOCUMENT, A PLAN FOR <br />CONTROLLING SEDIMENT FROM THE DISTURBED AREA_ABOVE THE.HOMESTEAD <br />IRRIGATION DITCH. <br />Stipulation No. 16 <br />WITHIN 90 DAYS OF PERMIT ISSUANCE COLORADO YAMPA COAL COMPANY SHALL <br />PROVIDE DOCUMENTATION OF THE ROUTT COUNTY COMMISSIONERS DECISION REGARDING <br />THE PERMANENT RELOCATION OF COUNTY ROAD 179, OR PROVIDE A RECLAMATION PLAN <br />FOR THE ROAD. <br />