Laserfiche WebLink
-Stipu}ationNa..--1--.. _..:. --. .. .. ...- - - - -.. -.. __ _. ..._.. _. <br />WITHIN 30 DAYS OF PERMIT ISSUANCE THE PERMITTEE MUST SUBMIT ALL HISTORICAL <br />-__ hADUNU WATER-QllALITY-INFORMATION FROM DEEP AQUIFER MONITOR WELLS <br />008-77-43, 008-79-7, AND 008-FM-6 INTO THE PERMIT APPLICATION. <br />Stipulation No. 2 <br />INSTANTANEOUS FLOW MEASUREMENTS FOR BOTH UPSTREAM SURFACE WATER MONITOR <br />SITES ON MIDDLE AND FOIDEL CREEKS MUST BE OBTAINED AT THE APPROXIMATE TIME <br />OF WATER QUALITY SAMPLE COLLECTION. THESE FLOW DATA MAY BE EXTRACTED FROM <br />CONTINUOUS FLOW RECORDS AT U.S.G.S. GAGING STATIONS 09243700 AND 09243900 <br />TO THE EXTENT WHICH THEY WILL BE AVAILABLE. HOWEVER, IF FOR ANY REASON <br />(OTHER THAN NO FLOW) THE U.S.G.S. DOES NOT COLLECT THIS INFORMATION-OR IS <br />NOT ABLE TO FORWARD THIS INFORh1ATI0N TO THE PERMITTEE IN A TIMELY MANNER, <br />IT WILL BE THE RESPONSIBILITY OF THE PERMITTEE TO COLLECT AND REPORT IT TO <br />THE DIVISION WITHIN THE PERMITTEE'S ANNUAL HYDROLOGIC MONITORING REPORT. <br />Stipulation No. 3 <br />CYCC IS MONITORING WATER QUALITY AT UPSTREAM SITE 18 ON MIDDLE CREEK <br />ACCORDING TO THE SCHEDULE IN TABLE B OF EXHIBIT 15. THE DIVISION DIRECTS <br />THAT THE PERMITTEE ALSO t40NITOR WATER QUALITY ON FOIDEL CREEK UPSTREAM OF <br />THE MINE ACCORDING TO THE SAME SCHEDULE. THIS MONITORING SITE MUST BE <br />LOCATED UPSTREAM NEAR THE WESTERN PERMIT BOUNDARY AND MAP 4A MUST BE <br />REVISED WITHIN 30 DAYS OF PERMIT ISSUANCE TO SHOW THE LOCATION. THE <br />MONITORING INFORMATION FROM FOIDEL CREEK SHALL BE INCLUDED IN THE <br />PERMITTEE'S ANNUAL HYDROLOGIC MONITORING REPORT TO THE DIVISION. <br />Stipulation No. 4 <br />INSTANTANEOUS STREAMFL0IJ MEASUREMENTS SHALL BE OBTAINED AND RECORDED BY <br />THE PERMITTEE AT THE SAME TIt4E THAT WATER QUALITY SAMPLES ARE COLLECTED AT <br />SITE 29 ON MIDDLE CREEK AT A f~1INIMUM DURING THE MONTHS FROM JUNE THROUGH <br />OCTOBER. THESE FLOW MEASUREMENTS SHALL BE INCLUDED IN THE PERMITTEE'S <br />ANNUAL HYDROLOGIC MONITORING REPORT. <br />Stipulation No. <br />WITHIN 60 DAYS OF PERMIT ISSUANCE, THE RERt4ITTEE MUST AMEND THE <br />__RECLAMATION_.TIMETABLE..LNDER RULE_2.05.4 OF THE PERMIT APPLICATION TO <br />INCLUDE RECLAtMTION AND RESTORATION OF THE DISTURBED AREA ASSOCIATED WITH <br />THE MIDDLE CREEK MINE OFFICE COMPLEX. <br />Stipulation No. 6 <br />THE PERMITTEE SHALL SUBI4IT THE DESIGN FOR THE HAUL ROAD DRAINAGE DITCHES <br />AS A TECHNICAL REUISION TO THE DIVISION FOR APPROVAL PRIOR TO CONSTRUCTION. <br />