Laserfiche WebLink
<br />STIPULATION N0. 13: <br />AT LEAST 90 DAYS PRIOR TO INITIATION OF POND CONSTRUCTION THE PERMITTEE WILL <br />SUBMIT A TECHNICAL REVISION INCLUDING DESIGN INFORMATION FOR THE SIX PROPOSED <br />STOCK PONDS, DEMONSTRATING COMPLIANCE WITH THE REQUIREMENTS OF RULE <br />4.05.9(1). POND CONSTRUCTION MAY NOT BEGIN UNTIL THE REVISION IS APPROVED. <br />STIPULATION N0. 14: <br />WITHIN 60 DAYS OF ISSUANCE OF THE PERMIT RENEWAL, THE PERMITTEE WILL REVISE <br />THE RILL AND GULLY STABILIZATION PLAN TO INCLUDE AN APPROPRIATE CALENDAR <br />DEADLINE FOR COMPLETION OF ANY NECESSARY RILL AND GULLY STABILIZATION WORK. <br />THE REVISED PLAN WILL ALSO PROPOSE A SPECIFIC CRITERIA FOR DETERMINING WHEN <br />REPAIR WORK ON ERODED SEGMENTS OF APPROVED PERMANENT GULLIES WOULD BE <br />INITIATED. <br />