My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL34195
DRMS
>
Back File Migration
>
General Documents
>
GENERAL34195
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:55:48 PM
Creation date
11/23/2007 7:52:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981071
IBM Index Class Name
General Documents
Doc Date
10/26/1987
Doc Name
PROPOSED DECISION & FINDINGS OF COMPLIANCE FOR RN1
Permit Index Doc Type
FINDINGS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />~UU•i' 7 `.'/ d5 ill S `a nce from t:ae mine 51 t~ i nC~"ea;25. The S3 i t D~ Ulne Can 5g <br />expected to migrate approximately 48.5 ft/year. <br />Spoils springs and seeps will continue to develop at the base of the spoils <br />placement area. Spoils water nut infiltrating the bedrock aquifers will <br />discharge from these seeps. Spoils spring discharges will increase the salt <br />load in the upper Foidel Creek drainage. Estimated salt load from the Little <br />Middle Creek tract is expected to be approximately 700 tons/year. This value <br />will decrease as the spoils are flushed by recharge water. <br />The applicant predicts that the approximately 4,000 acres of backfilled spoils <br />will produce spring flows ranging from 320 - 5,800 gpm (0.71 - 12.92 cfs). <br />This assessment was based on a study of existing spring flows during the past <br />bHO years. The Division developed an estimate of spring flows which showed a <br />range of 425 gpm - 7,845 gpm (0.95 cfs - 17.5 cfs) based on infiltration rates <br />of three inches (3")!year and bedrock recharge along the highwall. <br />4 flushing rate of 0.9 1/kg would result in flushing a 60 foot column of <br />spoils in 310 years. Flushing the same column at 1.5 1/kg would take 516 <br />years. Complete flushing of the spoils material will result in a return of <br />total dissolved solids concentrations to background levels. <br />No hydrologic or geologic changes are expected to occur to the Trout Creek or <br />Twentymile Sandstones. The Twentymile Sandstone crops Lo the northeast of the <br />proposed mine area and is separated from i4ine 1 and Eckman Park both areally <br />and stratigraphically. The Twentymile Sandstone is hydrologically isolated <br />from the Wadge overburden aquifer by approximately 700 feet of low <br />permeability marine shales. The Fish Creek seam, removed in Mine 2, is <br />stratigraphically above the Twentymile Sandstone. Sixty feet of siltatone and <br />shale separate these strata. The low permeabilities of the intervening <br />siltstones and shales will hydrologically isolate the Twentymile Sandstone <br />from the overlying Fish Creek coal and replacement spoils material. No <br />changes in the Duality or quantity of ground water in the Twentymile Sandstone <br />is expected. The underlying Trout Creek Sandstone will not be affected by <br />mining in the Eckman Park Mine complex. The recharge area of the Trout Creek <br />Sandstone lies outside of the mine area and outside the Foidel Creek <br />drainage. The Trout Creek sandstone is stratigraphically below the 'rladge coal <br />seam and, therefore, will not be disturbed by mining. <br />Higher potentiometric heads in the Trout Creek Sandstone aquifer than those in <br />the post-mine spoils will prevent discharge from the mine into the Trout Creek <br />Sandstone. <br />3. Surface lister <br />Inr_reased erosion and runoff are short term consequences associated with the <br />active mining operation. Chemical changes of the surface hydrologic system <br />are long-term impacts associated with the development of spoils aquifers. <br />Runoff and erosion increase during the period between vegetation removal and <br />vegetation re-establishment on reclaimed slopes. The operator utilizes <br />sedimentation ponds to prevent siltation of surface waters outside the permit <br />Brea and a variety of operational procedures to minimize erosion on-site. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.