Laserfiche WebLink
<br />2920 <br />CO-030-TU-78-6 <br />Amendment <br />(161) JD <br />Special Stipulations <br />In addition to the sixteen Stipulations from the 12/16/81 TUP Renewal <br />(Copy attached) the following Special Stipulations are also required. <br />1. All topsoil removed for construction of the lagoon will be stock- <br />piled and reserved until the lagoon construction is complete. <br />After construction the lagoon will be lined if necessary with <br />soil, with a high clay content, to insure sewage leachates will <br />not move into surface water downslope from the new pond. <br />2. No surface runoff will be diverted into the new lagoon. The lagoon <br />will only be used for sewage as long as the old lagoon is being <br />cleaned. Once the old lagoon is dry and cleaned the new lagoon <br />will be completely dewatered. <br />3. The Uncompahgre Area Manager will be notified 5 days prior to <br />construction of the lagoon. <br />4. CWI will file for a lease immediately on the tailings piles and will <br />include the sewage lagoons within the lease application. <br />Page 2 of 3 <br />