Laserfiche WebLink
./ •. <br />j -3- <br />Stipulation No. 7 <br />THE APPLICANT SHALL h10NITOR THE 2 MONITORING WELLS LOCATED OVER THE FIRST <br />~j ANEL TO BE SUBSIDED ONE YEAR PRIOR TO MINING THIS PANEL. THE APPLICANT SHALL <br />SUBh1IT TO THE REGULATORY AUTHORITY GROUND WATER LEVEL DATA AND WATER QUALITY <br />DATA PRIOR TO MINING THIS PANEL. <br />Sti ulation No. 8:`~ <br />~' <br />a~ HE APPLICANT'S QUARTERLY MONITORING REPORTS SHALL INCLUDE QUALITY AND <br />QUANTITY MONITORING OF ALL DISCHARGES FROM THE MINE SITE. WATER QUALITY <br />MONITORING SHALL CONSIST OF THE EFFLUENT LIMITATIONS PLUS TOTAL DISSOLVED <br />SOLIDS. <br />Stipulation No. 9: <br />3c-,~ HOULD THE APPLICANT ENCOUNTER tgORE GROUND WATER THAN ANTICIPATED, PRIOR TO <br />~ HE DISCHARGE OF EXCESS MINE WATER, THE APPLICANT SHALL PROVIDE AN ANALYSIS OF <br />ANTICIPATED WATER QUALITY AND QUANTITY, AND AN ASSESSMENT OF THE EFFECTS ON <br />THE RECEIVING STREAM. <br />C ~ ~ Stipulation No. 10:~ WHEN THE APPLICANT SUBMITS A PERMIT APPLICATION TO <br />.~/'~~/ UNDERMINE THE DRY FORK OF MINNESOTA CREEK, THE SUBSIDENCE PROTECTION PLAN <br />SHOULD BE BASED UPON MONITORING INFOR6IATION COLLECTED DURING THE EARLIER <br />PHASES OF MINING. <br />Stipulation No. 11:' WEST ELK COAL COMPANY OR ANY SUCCEEDING OPERATOR OF THE <br />a MT. GUNNISON NUMBER 1 MINE, MUST SUBMIT TO THE DIVISION AN ANNUAL HYDROLOGIC <br />REPORT. THIS REPORT SHALL INCLUDE AN ANALYSIS OF ALL HYDROLOGIC DATA GATHERED <br />DURING THE YEAR, AN ASSESSMENT OF THE IMPACTS OF MINING DURING THE YEAR, AND <br />AN ESTIMATE OF THE PROJECT IMPACTS OF MINING IN THE FOLLOWING YEAR. THIS <br />REPORT SHALL ASSESS THE IMPACTS OF MINING ON THE QUALITY AND QUANTITY OF WATER <br />IN SURFACE STREAMS, SPRINGS, GROUND WATER AQUIFERS, t4INE INFLOW AND MINE <br />DISCHARGES. <br />Stipulation No. 12: / <br />FOLLOWING STOCKPILING, TOPSOIL STOCKPILES THAT WILL NOT BE REDISTRIBUTED FOR <br />FIVE OR MORE YEARS SHALL BE SEEDED WITH THE PROPOSED PERMANENT SEED MIX <br />(EXCLUDING SHRUBS) AND NOT THE TEMPORARY SEED MIX. <br />Stipulation No. 13:" THE DIVISION DIRECTS WECC TO COMPLETE THE INSTALLATION OF <br />THE SUBSIDENCE MONITORING NETWORK PRIOR TO THE INITIATION OF EXTRACTION OF <br />'~''rX~ COAL WITHIN THE PANEL DESIGNATED IN APPENDIX A TO THE NOVEMBER, 1984 PERMIT <br />REVISION APPLICATION ENTITLED "APPLICATION TO REVISE THE MINING AND <br />RECLAMATION PLAN FOR THE MT. GUNNISON N0. 1 UNDERGROUND MINE". THIS <br />MONITORING NETWORK IS DESIGNEU TO MONITOR THE FIRST PANEL WEST FROM THE SW <br />MAINS INTAKES AND SOUTH OF THE N0. 1 WEST SUBMAINS, DESIGNATED AS "PANEL <br />1W-1S", LOCATED ADJACENT TO ANO PARALLEL TO THE WESTERN BOUNDARY OF SECTION <br />21, RANGE 90W, TOWNSHIP 135. THIS MONITORING NETWORK SHALL CONSIST OF <br />SUBSTANTIAL MONUMENTS DESIGNED TO RESIST FROST-HEAVE, FIRE, AND THE ACTIONS OF <br />CATTLE AND WILDLIFE. <br />