Laserfiche WebLink
<br /> <br />industrial activity may choose to apply for any of three <br />\•. different type of permits: <br />- individual <br />- group <br />- general <br />Each type of permit has its own advantages and <br />disadvantages. <br />A. Individual permit (55 Fed. Reg. 48003, 48015-21, <br />48066-67)?` <br />-- applications are due October 1, 1992. <br />-- permit conditions may be site-specific <br />-- principal disadvantage is cost of gathering <br />data to support the application <br />I B. Group permit (55 Fed. Reg. 48003, 48021-29, 48067-68) <br />1. Basic rules <br />-- entities representing a group of applicants <br />that are: <br />a. part of the same effluent guideline <br />subcategory; or <br />b. sufficiently similar in their operation as <br />defined by 40 C.F.R. 122.28 may file a group <br />application: <br />2/ See also, Guidance Manual For the Preparation of NPDES Permit <br />Applications for Storm Water Discharges Associated with <br />Industrial Activity (EPA 505/8-91-002). <br />~ - 9 - <br />