My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL34143
DRMS
>
Back File Migration
>
General Documents
>
GENERAL34143
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:55:46 PM
Creation date
11/23/2007 7:49:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984067
IBM Index Class Name
General Documents
Doc Date
11/18/1985
Doc Name
MINING PERMIT (Dated 11/18/85 to 11/18/90)
Permit Index Doc Type
PERMIT LEGAL DOCUMENT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stipulation No. 9 <br />WITHIN THIRTY <br />SUBMIT A PLAN <br />BERM INTO THE <br />THE DIVISION <br />Stipulation No. 10 <br />(30) DAYS OF PERMIT ISSUANCE, THE APPLICANT MUST <br />TO PREVENT SEEPAGE FROM COAL GULCH THROUGH THE <br />FACILITIES AREA. THIS PLAN MUST BE APPROVED BY <br />AND IMPLEMENTED PRIOR TO COMMENCEMENT OF MINING. <br />WITHIN THIRTY (30) DAYS OF PERMIT ISSUANCE, THE APPLICANT MUST <br />SUBMIT TO THE OIVISION FOR APPROVAL, A PLAN FOR RECLAMATION OF <br />THE COAL GULCH DIVERSION AND PLANS FOR RE-ESTABLISHMENT OF THE <br />PERMANENT POST-MINING COAL GULCH CHANNEL. THE DESIGNS MUST BE <br />APPROVED IN WRITING BY THE DIVISION PRIOR TO THIS STIPULATION <br />BEING SATISFIED. <br />Stipulation No. 11 <br />WITHIN THIRTY (30) DAYS OF PERMIT ISSUANCE, THE APPLICANT MUST <br />SUBMIT TO THE DIVISION A PLAN FOR EROSION CONTROL OF THE <br />TEMPORARY COAL GULCH DIVERSION ADEQUATE TO HANDLE THE <br />VELOCITIES OF THE 10-YEAR, 24-HOUR STORM. THIS PLAN MUST BE <br />APPROVED PRIOR TO IMPLEMENTATION. <br />Stipulation No. 12 <br />THE APPLICANT MUST SUBMIT ADEQUATE DESIGNS FOR THE CULVERT <br />CONVEYING FLOWS FROM THE COAL GULCH DIVERSION UNDER THE HAUL <br />ROAD WITHIN THIRTY (30) DAYS OF PERMIT ISSUANCE. THESE <br />DESIGNS MUST BE APPROVED BY THE DIVISION PRIOR TO ANY HAUL <br />ROAD CONSTRUCTION. <br />Stipulation No. 13 <br />WITHIN THIRTY (30) DAYS OF PERMIT ISSUANCE AND PRIOR 70 ANY <br />ADDITIONAL DISTURBANCE, THE APPLICANT MUST SUBMIT TO THE <br />DIVISION FOR APPROVAL DESIGNS FOR THE WEST DITCH ADEQUATE TO <br />PASS THE FLOWS FROM A 10-YEAR, 24-HOUR STORM. THE DESIGNS <br />MUST BE APPROVED IN WRITING BY THE DIVISION PRIOR TO THIS <br />STIPULATION BEING SATISFIED. <br />
The URL can be used to link to this page
Your browser does not support the video tag.