Laserfiche WebLink
COAL BASIN MAINTENANCE - REVEGETATION <br />BID SCHEDULE <br />UNIT <br />ITEM DESCRIPTION 9TY UNIT PRICE AMOUNT <br />1 Erosion Control Material 1 Job N/A <br />Installation including preparation, <br />seeding, material installation, <br />applied tackifier <br />.~~~ <br />2 Equipment Rental - Dozer 16 Hrs. <br />Cat D-3C or 67 FHP <br />equivalent with ripper and operator <br />3 Revegetation 1 Job N/A <br />including extra mulch <br />application. <br />GRAND TOTAL <br />~T'~i <br />t <br />~i o~ <br />00, <br />~g r oD <br />~ "7~.~ <br />