Laserfiche WebLink
September Monthly/3`d Quarter Report - 2002 <br />• Page 4 <br />American Tunnel Bulkhead No.3 <br />The tunnel flow was captured and diverted through the construction area and excavation <br />for the American Tunnel Bulkhead No.3 was completed in September. The forms will be <br />constructed in October. <br />If you have any questions on this report, please contact me. <br />I certify under penalty of law that I have personally examined and am familiar with the <br />information submitted herein: and based on my inquiry of those individuals immediately <br />responsible for obtaining the information, I believe the submitted information is true, <br />accurate and complete. I am aware that there are significant penalties for submitting false <br />information, including the possibility of fine and imprisonment. See 15 U.S.C. Section <br />1001 and 33 U.S.C. Section 1319. <br /> <br />cc: EPA -Bruce Kent (8P-W-T) <br />DMG -Wally Erickson <br />Allen Sorenson <br />Sincerely, <br />~-~ ~_ <br />Larry Perino <br />Reclamation Manager <br /> <br />