My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL34096
DRMS
>
Back File Migration
>
General Documents
>
GENERAL34096
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:55:44 PM
Creation date
11/23/2007 7:48:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
General Documents
Doc Date
12/3/1999
Doc Name
COMMENTS REGARDING A SLURRY WALL SAN LUIS PROJECT M-88-112
From
DMG
To
KELLY HAGLUND GARNSEY & KAHN LLC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ III IIIIIIIIIIIIIIII ~ <br />STATE OF COLORADO <br />DIVISION OE MINERALS AND GEOLOGY <br />Department of Natural Resources <br />131 3 Sherman SI., Room ? 15 <br />Denver, Colorado 80?03 <br />Phone: 1303) 866-3561 <br />FAX: (3011 B3?-8106 <br />December 3, 1999 <br />Ms Lori Potter <br />Kelly/Haglund/Gamsey & Kahn LLC <br />1441 18th Street, Suite 300 <br />Denver CO 80202-1255 <br />~~ Jam. <br />Re: Comments Regarding a Slurry Wall, San Luis Project, M-88-112 <br />Dear Ms. Potter: <br />DIVISION OF <br />MINERALS <br />GEOLOGY <br />RECLAMATION <br />MINING•SAFETY <br />Bil I Owens <br />Governor <br />Greg E. watcher <br />E.ecuove Direuor <br />ntichaelB Long <br />Division DveUOr <br />The Division received your comments regarding BMRI's proposal to install a slurry wall at [he <br />West pit. The proposal you are referring to, I believe, was submitted to the CDPI-[E and not [o the <br />DMG. The DMG has not required the installation of a slurry wall so the submittal is not <br />necessary to satisfy any corrective action from the DMG. However, it appears, BPdRI is <br />proposing to instal] a slurry wall to satisfy possible corrective actions that the CDPHE may have <br />required. <br />If requested. it may be necessary for the DMG to review the proposal to assure thlu i[ is <br />adequately constructed and that all the other potential problems associated with tFe structure are <br />addressed. <br />Currently, the Division does not have an official revision submittal for a slurry will a[ the San <br />Luis Project. <br />If you have any questions, please give me a call. <br />S~ncerely, / ~~ ~ ~ <br />,/'i~c'K-Q-~ /~~, l <br />i' James Dillie <br />Environmental Protection Specialist <br />cc: H. Bruce Humphries. DMG <br />James Stevens, DMG <br />
The URL can be used to link to this page
Your browser does not support the video tag.