Laserfiche WebLink
Name of contacts at West Elk Mine, Denver Rio Grande Railroad and <br />Delta Montrose Electric Association <br />Mountain Coal Company, West Elk Mine- Chris Nyikos 929-2256 <br />Legal - Jim Schrack 293-4693 <br />Denver Rio Grande Western Railroad- Norris Wiseman 248-4219 <br />or 634-2452 <br />Insurance- Jerry Pearson 634-2067 <br />Delta Montrose Electric Association- John Sulkey 874-8081*462 <br />Department of Transportation- John E. Smith 248-7360 <br />Eauipment Rental- Additional Dozer Work <br />Equipment of any size above or below the minimum flywheel <br />horsepower (D6 dozer 90 FWH minimum) may be furnished subject to <br />the approval of the PROJECT MANAGER. In order to evaluate the <br />bids for various sizes of equipment proposed to be furnished by <br />the bidders, the unit price inserted in the bid must be adjusted. <br />The bidder may figure the unit price to insert in the Invitation <br />and Bid by doing the following computation for the applicable bid <br />item: <br />(Rate you want oer hourl X (Requested FHP)= Price on Schedule <br />(The FHP of your Machine) <br />Use the calculated amount as the unit price on the Invitation and <br />Bid. If the CONTRACTOR plans to furnish a machine other than the <br />minimum FHP listed on the Invitation and Bid, he must write FHP <br />of the machine, in ink, under the bid item on the Invitation and <br />Bid, or include it on the "List of Equipment Offered" form. <br />After the successful bidder has furnished evidence of the FHP <br />capacity of the equipment to be used, the amount of the bid for <br />Equipment Rental will be modified by reversing the above <br />procedure to reflect the unit price desired by the CONTRACTOR <br />with a corresponding reduction in the quantity of hours required. <br />This modified hourly rate and number of hours will appear on the <br />Purchase Order. <br />Project Work Specifications <br />It is assumed that the first fifty (50) feet of the Silos <br />contains a double mat of ~5 rebar at 8 by 12 centers. DMG does <br />not guarantee this figure. <br />Preliminary Submittals 2.2.B.2 <br />The CONTRACTOR may use the forms supplied by the PROJECT MANAGER, <br />all other forms which will be utilized to meet the submittal <br />requirements of this specification must be submitted as a <br />preliminary submittal. <br />