Laserfiche WebLink
<br />more recently updated topography depicted on Map 77 and Map 83 <br />cross-sections. <br />Additional documents which may have some bearing on contemporaneous <br />reclamation issues include: <br />1) Technical Revision 39 addresses refuse area drainage control <br />improvements, and is currently under review by the Division. <br />2) The refuse cover depth study final report which was submitted <br />in January, 1996. I have our only copy of the report, an <br />additional copy may need to be requested from the operator if OSM <br />wants to review it in Denver. A copy of my adequacy review letter <br />should be on file in Denver. <br />3) The operator has indicated) that a Technical Revision <br />Application which would combine refuse subareas 2/3 and 4 will be <br />submitted within the next couple of weeks. If approved, this <br />revision would increase the refuse capacity of the two subareas, <br />delaying their final reclamation, and also delaying the development <br />of an additional refuse subarea. <br />That's all that really jumps out at me. Let me know if some of <br />this can't be found in Denver, or if you or the OSM reviewers need <br />additional information. <br />