Laserfiche WebLink
Supervision <br />The CONTRACTOR shall be responsible for the supervision of all mechanical operations of the <br />equipment including proper maintenance. <br />Equipment maintenance, fueling and repairs shall be done sot that spilling of lubricants and <br />fuel is minimized. <br />Performance of Work <br />Supplemental work shall be performed after the general construction work in that particular <br />area and shall consist of general earthmoving or other finishing work as may be directed by <br />the PROJECT MANAGER. <br />All operations under this section will be under the direct supervision of the PROJECT <br />MANAGER and work under this section shall be performed only as ordered and directed by <br />the PROJECT MANAGER. The PROJECT MANAGER will designate the work to be performed <br />and the order in which it is to be done, and WILL inspect all work. The PROJECT MANAGER <br />will maintain documentation of the work. <br />Equipment Rental Documentation <br />At the close of each day's operations during which equipment rental work has been conducted <br />under this specification, the PROJECT MANAGER shall prepare a form entitled "Equipment <br />Rental Record" listing the date, times and total hours (computed to the nearest one-half hourl, <br />each piece of equipment was operated in accordance with this specification. The PROJECT <br />MANAGER will obtain the signature of the CONTRACTOR on the form. <br />"Operation" means that time spent in performing work as well as time necessary for moving <br />equipment around the work site when directed by the PROJECT MANAGER. However, <br />"operation" does not include that time spent in transporting the equipment to the initial work <br />site, removing the equipment when all work had been completed, transporting the equipment <br />away from and returning it to the work site in the event of a temporary or seasonal <br />suspension of operation, maintenance of the equipment, any time during which the equipment <br />is "bogged down" or otherwise not working, nor for any periods when operations are <br />suspended by the PRINCIPLE REPRESENTATIVE. <br />19.4 MEASUREMENT AND PAYMENT <br />The number of hours each piece and type of equipment used as directed by the PROJECT <br />MANAGER under this specification will be counted to the nearest one-half hour. Payment will <br />be made at the unit price established by the Invitation and Bid Sheet and in the purchase order <br />contract for supplemental earthwork for each piece and type of equipment. Such payment <br />shall include the cost of all materials, accessories, labor, maintenance, operating supplies, <br />salaries of operators, and any other expenses incidental to the operation of the equipment in <br />the performance of work in accordance with this specification and bid item(s). No extra <br />payment will be made for the use of the same equipment while performing work on other bid <br />items on the Invitation and Bid Sheet, Bid Schedules or Purchase Order Contract. No <br />additional payment will be made for hauling equipment to or away from the work site except <br />as may be proper under Mobilization/Demobilization. <br />