Laserfiche WebLink
<br /> <br />Stipulations <br />Kerr Coal Company <br />Marr Strip; Marr Prep Plant <br />1. Y,ERR COAL IS REQUIRED TO CONSTAUCT ALL DITCIIES USING T11E DESIGN GRADES <br />RATHER THAN TI(E GRADES SIIOI/N ON FIAP 25a. IF TIfIS REQUIRES RELOCATING ANY <br />DITC1fES FROM T/JE LOCATION SHOt/N ON TIIE MAP, T1IEN A REVISED MAP Iba MUST BE <br />SUBMITTED AT THAT TIME. <br />2. KERR COAL IS DIRECTED TO SUDMIT A TIMETABLE FOR INITIATING ALL ASPECTS OF <br />THE MONITORING PROGRAM DESCRIBED ON PAGES 780-109aaa AND bbb. (JE REQUIRE <br />Tf175 INFORFVITION TO BE SUBMITTED BY SEPTEMBER )0, 1981. IN ADDITION XEPR <br />COAL IS REQUIkED TO SU DF(IT TO THE DIVISION A YEARLY REPORT ON TffE PROGRESS <br />OF MONITORING I/1IIC1f INCLUDES ALL DATA COLLECTED FOR THAT YEAR AND A DIS- <br />CUSSIOP7 ANY CONC LUS 70P75 1J117CIf CAN BE DRAI•JN FROH TffE DATA. KERR COAL SHOULD <br />WORK CLOSELY [/ITN TJJE DIVISION AS THE PROGRAM IS DEVELOPED AND MODIFY TO <br />INSURE THAT COMPREHENSIVE BUT EFFICIEJJT MONITORING f/ILL TAKE PLACE. <br />J. THE APPLICANT SHOULD RE-ANALYZE AND RE-S UDFI7T THE EXISTIIJC DATA IN TADLE 10 <br />TO CONSIDER THE EFFECTS OF COAL DUST ON IJATER QUALITY I'! THE ADJACENT S(/AFtP, <br />OR ALTERNATIVELY THE APPLICANT SHOULD REDESIGN TIIE IJATER MONITOR IfJG PROGRAM <br />AT TIfE TIPPLE TO COLLECT USADLE DATA. T1I75 INFORMATION SIfOULD BE SUDFI7 TTED <br />TD T1fE DIVISION NO LATER TlIAN APRIL 1, 1981. <br />4. KERR COAL COMPANY IS REQUIRED TO SUDMIT A PLAN TO TIl IS DIVISION, NO LATER <br />THAN SEPTEMDER 30, 1981, FOR .NINIMZZING THE DEPLETION OF .I/A TER FR019 SUDDU IH <br />DRAW CAUSED DY GROUND I/AT£R INFLOWS DISCHARGING INTO PIT ND. 3. ANY 19EASUREMENTS <br />WIJ CCH THE DIVISION DETERMINES TO BE NECESSARY TO ALLEVIATE THIS POTENTIAL PROBLEM <br />SHALL BE IMPLEFIENTED PRTOR TO MINING ADJACENT TO SUDDUTH DRAW. <br />~. KERR COAL IS DIRECTED TO MONITOR I/A TER QUALITY FROM THE SPRING ,1T TIIE OLD <br />SUDDUTIf PANE nUARTERLY FOR ONE YEAR, ACCORDING TO TIJE SANE PARAMETERS AS <br />OTHER HYDROLOGIC F1pNITORING. RESULTS ARE TO DE SUBMITTED TO TlJ IS DIVISION. <br />o'. XERR COAL IS REQUIRED TO UPDATE THIS P_°RIIIT ACCOFDIiIGLY ,1S INITI,IL OR FIJIAL <br />DECISIQNS ARE REilDERED RF. LATIVE TO PEfIDINC E74IS5IONS PERMIT APPLICA TIDFIS FOR <br />TIIE PROPOSED COAL JIZN ING ACTIVITIES. <br />7, KERR COAL IS REQUIR F.D TO STRIP TOPSOIL FROM TIIE CMPOUFlOMENT AREh OF ALL <br />SEDIMENT PONDS RE,NA IN ING TO BE CONSTRUCTED UNC.ESS TIIE DT VISIOI! SPECIFICALLY <br />AUTIfORIZES LCA L'I IlG TIfiS TOPSOIL IN PLACE, DASED ON A D1: FIQflSTRATION BY KERR <br />COAL T!!AT SEDIMENT COLLECTED IN EXISTING POlJDS FALLS f/l THIN THE PARAMETERS <br />Of NORMAL SOIL MATERIAL, ,1ND FURTHER T11AT TfJE TOPSOIL BENEATH SUCI! ACCUMULATED <br />SEDIMENT DOES NOT DEhICNSTRATE ADVERSE CFIPACTS EROM .SEDI.VENT DEPO.SITIOJJ ~)R <br />I/A TER RETENTION OR SiI OIJ A TREND T01/ARD UNACCEPTABLE .SOIL PA RAFIETERS. SUC!I <br />DEMONSTRATION SIIA C.L DE DASED UPON T11G RES(1 LTS OF T!(F. SED CFIENT AND TOPSOIL <br />SAMPLING PROGRAM PROPOSED BY KERR COAL, I/I TI! TllE ADDITION OF TIIE FOLLOWING <br />PARAMETERS TO TffE ANALYSES: ARSEtlIC, BOROPI, COPPER, LEAD, MERCURY, MOLYBDEtIUM, <br />SELEIJIUM, ZINC. IF Y.ERR COAL SffOULO ClIOSE NOT TO IFIPLEFIENT THIS SAMPLING <br />PROCRAFI, TOPSOIL MUST ALSO BE STR IPP£D FROFI TIfE EXISTING PONDS. <br />B. wrru RESPECT TO 511 PI1D DEIIS 7TY, A ./0 TF!'C I,'F C'QRT CS TO NE f4A DIC OY F'ERR COAf, AfID <br />TI(IS DIV Li Ir7N TO 17 [: ;EAI7C:I 1'IfE: CSSUL' ~H' APPROPI7CATE SIIRD.9 DENSITIES, AND AN <br />,1CCEPTADLE SUCCESS STANDARD ESTADLISIIED NO LATER THAN SEPTE?]DER 30, 1981. <br />