My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL33765
DRMS
>
Back File Migration
>
General Documents
>
GENERAL33765
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:55:34 PM
Creation date
11/23/2007 7:43:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
General Documents
Doc Date
12/12/1994
Doc Name
CRESSON PROJECT PN M-80-244 REQUEST FOR SPECIFICATION ADJUSTMENT FOR DURATION OF TIME FOR COVER
From
CRIPPLE CREEK & VICTOR GOLD MINING CO
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C~ Cripple Creek & Victor Gold Mining Company 999 <br />A Joint Venture -Pikes Peak Mining Company, Manager <br />~` 7 Operations Office Englewood Office <br />V P.O. Box 191, 2755 State Highway 67 5251 DTC Parkway, Suite 700, Englewood <br />Victor, Colorado 80860 Colorado 80111 <br />(719) 689-2977 • FAX (719) 689-3254 (303) 889-0700 • FAX (303) 889-0707 <br />December 7, 1994 <br />SENT BY FACSIMILE AND EXPRESS MAIL '~ECF~vFr <br />Mr. Berhan Keffelew <br />Environmental Protection Specialist <br />Colorado Department of Natural Resources <br />Division of Mines and Geology <br />Office of Mined Land Reclamation <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />UEC 12 1994 <br />Oivisio~ or Mlnera~s. a ~eu~c4; <br />Reference: Cresson Project• Permit M-80-244• Request For Specification Adjustment For <br />Duration Of Time For Cover Of VLDPE. <br />Dear Mr. Keffelew: <br />The Cripple Creek & Victor Gold Mining Company ("CC&V") has documented the <br />appropriateness of allowing a longer period of time between deployment of Very Low Density <br />Polyethylene ("VLDPE") and Drain Cover Fill. The statement to that effect from Gundle <br />(Gundle Lining Construction Corp) dated September 20, 1994 was transmitted to you via our <br />letter of yesterday (December 6, 1994). In order that our activities continue to be in compliance <br />with the more detailed Technical Specifications, CC&V requests that the applicable specifications <br />be amended from 14 days to 90 days to correspond with the more conservative end of the range <br />given by Gundle (3-4 months). <br />I believe the specifications in need of amendment are those found at pages 02200.0-7, 002200.0- <br />14 and 02200.0-15 and [hat they read: <br />"3.05 FILL PLACEMENT:... <br />"H. Drain Cover Fill ... <br />"9. CONTRACTOR shall place Drain Cover Fill at a rate such that no single <br />area of 350,000 square feet of geomembrane liner is exposed to ultraviolet <br />light for more than 14 days." <br />
The URL can be used to link to this page
Your browser does not support the video tag.