Laserfiche WebLink
_P8_ <br />The proposed design for the East dump calls for subtle, less than 5:1 <br />(horizontal to vertical) slopes. "The general land form of the East dump will <br />be that of a rounded mound some 200 yards northeast of where a natural rounded <br />mound stood before mining" (Page 11, Appendix J). <br />Rule 4.14.2 specifically requires that all areas affected by surface mining <br />operations shall be returned to their approximate original contour. The <br />applicant proposes to restore the mine site to approximate original contour. <br />The Division has evaluated the relocation of a minor ridge by 200 yards and <br />has determined that the resulting postanining topography meets the <br />requirements of approximate original contour. <br />The operation is in compliance with the requirements of this section. <br />XVIII. Mine Facilities, Coal Handlin Structures <br />u es an <br />port Facilities - <br />The mine facilities, coal handling structures, and support facilities sections <br />of the application have been reviewed by the Division for compliance. This <br />information can be found in section D of the permit application. <br />All structures and facilities have been designed in accordance with the <br />applicable performance standards. <br />The operation is in compliance with the requirements of this section. <br />XIX. Coal Processin Waste and Non-Coal Processing Waste - Rules <br />£.~T~.3T9T-~3Tf~~0~3TT6~~(15~721T1'~: aTD~~II <br />The Division has reviewed the application for compliance with these sections. <br />Information is contained on page D-3a of the application. This operation will <br />not produce any coal processing waste. All non-coal waste will be <br />appropriately disposed of. <br />The operation is in compliance with the requirements of this section. <br />XX. Roads - Rules 2.05.3 (3)(c)(i) and 4.03 <br />The Division has reviewed the relevant sections of the permit application <br />(Section D, pages 6-g) for compliance. <br />The haul road at the mine is in two sections. fie first section is an <br />upgraded BLM right-of-wdy 4732 feet long; the second is 2768 feet of new <br />road. The information contained in the application verifies that the <br />location, design, construction, drainage, surfacing, maintenance, and <br />reclamation of the roads were planned with the consideration of the design and <br />performance standards of Rule 4.03.1. <br />It should be noted that Rule 4.03.1(4) contains specific designs for the <br />spacing of culverts on haul roads. The applicant is in compliance with the <br />spacing requirements, with the exception of the first 3300 feet of the haul <br />road. The Division has granted a variance from the requirements of rule <br />4.03.1 (4 )(e)(vi) for this road segment. The decision was based on the <br />following facts presented in the application: <br />