Laserfiche WebLink
~;... _ <br />(f) Pipeline Rights-of-Wav. No surface disturbing activities except for essential roads and utility crossings <br />shall be allowed within the rights-of-way for existing eas pipelines along the Highway 139 corridor. The lessee shall <br />work with the right-of-way holders to locate the pipelines on the ground. Subsidence shall not be permitted within <br />100 feet of the outside line of the right-of-way for [he pipelines (125 feet from centerline along each side of <br />pipeline). The angle of draw used to protect the pipelines from subsidence will be dictated by the approved DMG <br />Mine Permit. <br />(g) Perennial Streams Water Quality. No surface-disturbing activities except for essential roads and <br />utility crossings shall be allowed within 100 feet of East Sale Creek. Subsidence shall not be permitted within 100 <br />feet of the stream. The angle of draw used to protect the stream from subsidence will be dictated by [he approved <br />DMG Mine Permit The affected portions are listed below: <br />T. 7 S., R. 102 W., 6'" P.M. <br />sec. 3, lots 21 to 24, inclusive; <br />sec. 9, tots 1 to 11, inclusive, and tots 13 [a 16, inclusive; <br />sec. 10, lots I and 2. <br />(h) Deer and Elk Winter Ranee. In order to protect important seasonal wildlife habitat, surface-disturbing <br />activities other than subsidence shall only be allowed during the period from May 1 to December 1 on [hose portions <br />of [he lease listed below. This limitation does no[ apply to consuuction and ongoing operations associated with the <br />mine site, surface facilities, and haul road areas. <br />T. 7 S., R. 102 W., 6`" P.M. <br />sec. 3, lots 21 to 24, inclusive; <br />sec. 8, E'/zSE'!a; <br />sec. 9, all; <br />sec. 10, lots 1 and 2. <br />(i) Scenic and Natural Values (SNV). Special design and reclamation measures may be required in some <br />of [he SNV stipulation areas listed below in order to protect [he outstanding scenic and natural landscape values of <br />the Book Cliffs and highway corridor. The special design and reclamation measures would be developed at [he <br />development stage. Special reclamation measures may include transplanting trees and shrubs, fertilization, ,~ <br />mulching, special erosion conuol structures, irrigation, and site recontouring to match the original contour. Surt~'sce- <br />disturbing activities other than subsidence may be denied in sensitive areas within the leases, such as unique geo{o~ic <br />features and rock formations, visually prom}nent areas, and high recreation use aeeas. ~;~ <br />T. 7 S., R. 102 W., 6'~ P.M. `' <br />sec. 3, lots 21 [0 24, inclusive; <br />sec. 4, lots 9 to 14, inclusive, S%zNE'/a, SE'/aNW'/a, SW'/a, and NW'/aSE'/a; <br />sec. 5, SE'/SEA/a; ~~ <br />sec. 8, E'/zE'/z; '- <br />O <br />sec. 9, all; <br />sec. 1Q, tots 1 and 2, SW'/aNW'/a, and W'hSW'/a <br />(j) Steep Slopes. The lease includes lands with greater than 40 percent slopes. In order to avoid or mitigate <br />unacceptable impacts to soil, water, and vegetation on these lands, special design practices [hat result in higher than <br />normal operating costs may be necessary. Where impacts cannot be mitigated, no surface-diswrbing activities shall <br />be allowed. The affected portions are listed below: <br />T. 7 S.. R. 102 W., 6`h P.M. <br />sec. 4. lots 11 and 12, SEYaNE`/a, SE'/aNW'/a, and SWYa; <br />sec. 5, SE'/aSE'/a; <br />sec. 8, E%zNE'/a, and NE'/aSE'/a; <br />t; lJ <br />l~ i <br />__ _J <br />--• <br />~_i <br />„i <br />