Laserfiche WebLink
cata>i~u~. • <br />S~orm~Yaex Mie~ema~ Ptun <br /> <br />oao4~ aq.;~rs . <br />permit boundary. All floor drains ere piped to the tailings pond Aseptic system is <br />installed east of the mill building for toilets end sinks. <br />6. Conrpreidrdvelnapection <br />A comprehensive inspection will be made twice per year end the results of the inspection will <br />be swnmeria~ed and reported in the Annual Report. <br />7. Recordkuping and lntaaa! Reporting Proctdwru . <br />A log will be maintained for the SWMP that will include any spills, leaks, end maintenance <br />activities. <br />S. Conaisfency with Otko i9lanl <br />The SWMP measures to control runoff end prevent contamination of stomiwater ere included <br />in end consistent with the Mined Lend Reclamation Permit. Best management practices ere <br />covered in both plans end are being monitored by the Division of Minerals end Geology. <br />9. AllowableNon~tornrwater!)lydiroger <br />Not applicable. <br />