Laserfiche WebLink
•~ <br />27 <br />XXI. Sealing of Drill <br />anA d_n~'- <br />Closure plans for drill holes, mine portals and shafts are delineated on pages <br />4-b9 through 4-69a of Volume I. <br />Monitoring wells when reclaimed must not be filled to the surface with <br />concrete as described on pages 4-69 and 4-b9a. Therefore, the following <br />stipulation is required: <br />Stipulation No. 10 <br />DURING RECLAMATION OF MONITORING WELL DRILL HOLES THE TOP 3 FEET OF THE <br />HOLE MUST BE BACKFILLED WITH DRILL CUTTINGS, SOIL MATERIALS, OR OTHER <br />SOFT, FRIABLE MATERIAL AS AVAILABLE SO AS NOT TO PRECLUDE CULTIVATION <br />OF THE AREA WHERE DRILL HOLES EXIST. <br />With the acceptance of the above stipulation, the proposed operation is in <br />compliance with the requirements of this section. <br />