Laserfiche WebLink
.-~•. <br /> TOPSOIL HANDLING PLAN <br /> Revised 4-3-83 <br />Table 2.05-4 INSITU* TOPSOIL/SUBSOIL <br />Mining Soil Thickness <br />Phases Type Topsoil Subsoil Acres <br />I Ste 5" 22" 1.32 <br />I Abd 3" 38" 3.49 <br />II Ste 5" 22" 0.18 <br />II Abd 3" 38" 2.39 <br />III Te 2" 40" 5.5 <br />III Nd 4" 20" 1.7 <br />IV Ste 6" 30" 2.42 <br />IV Abd 6" 2" 2.61 <br />IV Te 6" 2" 6.29 <br />V Ste 6" 30" 3.40 <br />V Abd 6" 2" 3.01 <br />V Te 6" 2" 5.77 <br />*Excluding previous disturbed area <br />Volume (BCY) <br />Topsoil Subsoil <br /> <br />887 3,904 <br />1,408 17,830 <br />121 532 <br />964 12,210 <br />1,479 29,578 <br />914 4,571 <br />1,952 9,761 <br />2 ,105 702 <br />5,074 1,691 <br />2,743 13,715 <br />2,428 809 <br />4,654 1,551 <br /> <br />