My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL33591
DRMS
>
Back File Migration
>
General Documents
>
GENERAL33591
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:55:29 PM
Creation date
11/23/2007 7:41:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981020
IBM Index Class Name
General Documents
Doc Date
9/8/1982
Doc Name
MUNGER CYN MINE C-020-81 PROPOSED DECISION & FINDINGS OF COMPLIANCE
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />-3- <br />• Sti ouZation No. 4 <br /> <br />SALT CREEX .MINING COMPANY SHALL I`JSTALL AND MONITOR THE PROPOSED <br />.MONITORING WELL G.~'-6 ONE YERR PRIOR TO THE CONSTRUCTION OF THE <br />HUNGER CANYON fIINE lJASTE ROCK PILE. WATER QUALITY SAMPLES AND <br />WATER L.°'VELS SHALL BE TAKEN QUARTERLY. MONITORING SBALL dE SUB- <br />MITTED TO THE REGULATORY AUTHORITY QUARTERL'!. <br />Stipulation No. 5 <br />THE APPLICANT SHALL NOT :FINE MORE THAN 100,000 TONS OF COAL ANNUALLt <br />UNTIL TBEY HAVE CBTALNED A REVISED AIR QUALITY PERMIT FROM THE <br />COLORAAO DEPARTbfEIlT OF HEALTH FOR THE NIGHER PRODUCTION LEVEL. <br />Stipulation No. o <br />WITHIN 6 MONTHS OF PERMIT ISSUANCE, THE PERMITTEE MUST PROVIDE THE <br />REGULATORY AUTHORIT!' WITH AN ANALYSIS OF TXE FILL (DISTTIRBED LANDS) <br />AND ANY OTHER DISTURBED MATERIAL WHICH WILL NOT dE TOPSOILED PRIOR <br />TO REVEGETATION. THIS ANALYSIS WILL BE DONE ON AN APPROPRIATE HUMBER <br />OF REPRESENTATIVE SAMPLES TAKEN TO A DEPTH OF AT LEAST 4 FEET, AND <br />WILL INCIUDE ALL REQUIRED PARAMETERS FOR A DETERFI7NATION OF SUIT- <br />ABILITY FOR RECLAMATION. <br />Stipulation No. 7 <br />TOPSOIL h1UST HE .aNAL'YZED FOR FERTILIZER ELEhIENTS PRIOR TO SEEDING. <br />IF THE SOIL IS FOUND TO HE PHOSP.YOROUS-DEFICi ENT, PHOSP.YOROUS ?fUST <br />BE IPlCORPORATED INTO THE TOPSOIL DURING THE .4ESPREADINC PROCESS. <br />ANY OTHER FERTILIZER ELc-,MENTS WHICH ARE DEFICIENT IN THE TOPSOIL <br />,NAY BE ADDED AFTER ONE YEAR'S GROWTH OF VEGETATION AT A TI:?E OF <br />YEAR APPROVED dY THE DIVISION. <br />StZDUlation ,VO. 8 <br />;JITHIC! ONE YEAR OF PERMIT ISSUANCE, TYE PER.MITTEE WILL SUBMIT A <br />PLAN TO THE REGULATORY AUTHORITY FCR SURFACE ?fAN_TPULATIOC! OF THE <br />SOILS TO ENHANCE MOISTURE RETENTIOC! AND REDUCE EROSION DURING <br />RECLafdATION. THIS PLAN WILL 9E REVIEWED 3Y THE DIVISION .aND <br />INITIATED dY THE PE.RMITTEE DURING RECLAMATION. <br />Stipulation .VO. 9 <br />THE .PERMITTEE SHALL RESAh1PLE iNE :fUNGc'R C.a.VYON dIG SAGc3RUSH <br />CC1?h!UNZTY POR P.40DUCTZON DUR77lC THE i98J G,?Cfdi NG SEASON, lFIE <br />SAMPLi NG SFfALL dE of .aN INTENSIT'Y TC ~YEET SAi9PLE ADEQUACY <br />REQUIRE:fENTS OF T!?E Di VZSIOCl. TYE RESULTS OF THE SAMPLIVG <br />SHALL 3E SUHh1ITTED TO T.YE REGULATORY AUT6'CRITY .`70 ir1 TER T.YAN <br />i0 DAYS AFTER THE CC:9PLLTIOIJ OF S.ai".PL:.`!G .:::D 9E_°OAi S?PTE:dBER <br />70, ia83. <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.