My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL33530
DRMS
>
Back File Migration
>
General Documents
>
GENERAL33530
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:55:27 PM
Creation date
11/23/2007 7:39:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977141
IBM Index Class Name
General Documents
Doc Date
1/19/1999
Doc Name
FAX COVER
From
GOLDENS COMPANIES
To
ERICA CROSBY
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JRN 19 '99 11:00RM GOLFS COMPRNIES • p.z <br />eorssrss <br />January 17, 1999 <br />Ms. Erica Crosby <br />Enviromnental Protection Spocinlist <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Re: Golden a Audaite Mining Company (Golden s) <br />Lyom Quarry Pit; Permit No. M-77-141- Finaneiat Warranty <br />Dear Erica: <br />I am writing to follow up on your letter regarding the finanaal surety for the Lyons Quarry. We have <br />reviewed your estimate of the antiapated reclamation costa for the quarry and have the following <br />comme~s: <br />• The estimate volume of material is your letter is 240,4221oose cubic yards (LCY). According to <br />our calculations the volume of materiel is 110,000 LCY because we have completed the following: <br />- We have filled in the sedimentation ponds and aze currently using the azea for stockpilittg <br />material, <br />- Mining is complete on the majority of Area 1, overburden has been replaced (we moved the <br />slide that you saw on your site visit to fill this area), the area has been regraded, topsoil has <br />been replaced and we are currently controlling weeds in anticipation of seeding in the spring. <br />- We are curremly mixing the westernmost portion of Area 1 and have removed approximately <br />half of the material. <br />• We concur with your trait costs for the anticipated work and estimate that the current bond should <br />be increased from $142,800 to $168,987 (an increase of 526,187). <br />I have enclosed a copy of the reclamation plan and 'indicated the work already completed. Please <br />review ovr estimate and let me know if you concur. We will forward the increased amotmt es soon as <br />you complete your review. Please contact me if you have any additional questions. <br />Sincerely, <br />GOLDEN' S ANDESITE MINIIdG COMPANY <br />~~., ~~~ <br />N rm Roche <br />Vice President, Operations ®~~ <br />Attachment <br />P.O. 90X aeB • Qf SOUTN 3UN9ET• LONOMONT, COLORA00 a060f • PNONE• (!0.9) 77F100.9 • METRO: ea9dla0 • fiUC t30!) Ba6frPP5 <br />-df ~+adfSon of Esesl<i+as- <br />
The URL can be used to link to this page
Your browser does not support the video tag.